1 of 75
Product Approval
ROBERTS GORDO
N
®
appliances have
b
een tested and CE certified as complying with the
essential re
q
uirements of the Gas Appliance Directive, the Low
V
oltage Directive, the
Electromagnetic Compati
b
ility Directive and the Machinery Directive for use on natural gas and
LPG when installed, commissioned and maintained in accordance with these instructions.
These instructions refer to appliances designed to operate in the European Union.
Appliances designed for other countries (
N
on-European Union) are availa
b
le on re
q
uest.
This appliance must
b
e installed in accordance with the local and national codes in force and used
only in a sufficiently ventilated space, as specified in these instructions.
Before installation, check that the local gas distri
b
ution systems, nature of gas and pressure, and
adjustment of the appliance are compati
b
le.
Summary of Contents for Blackheat BH15ST
Page 2: ......
Page 4: ......
Page 6: ......
Page 33: ...SECTION 7 U TUBE HEATER INSTALLATION 27 of 75 Figure 23 U Tube Assembly Overview mm 200 ...
Page 63: ...SECTION 13 WIRING 57 of 75 13 4 Typical External Wiring Diagram Multiburner ...
Page 64: ...BLACKHEAT INSTALLATION OPERATION AND SERVICE MANUAL 58 of 75 13 5 Internal Wiring Diagram ...
Page 82: ......
Page 83: ......