SECTION
8
: O
PTIONAL
H
EATER
A
CCESSORIES
31
8
.6 Wall Mountin
g
Install
w
all mounting brackets at the height sho
w
n in the
layout dra
w
ing pro
v
ided by the estimator. Space
w
all
mounting brackets and hangers as indicated by
dimensions d, e and f in the rele
v
ant Layout O
v
er
v
ie
w
dra
w
ing for your heater. For Linear heaters
see Page 13,
Figure 11
, for Double Linear heaters
see Page 16, Figure
13
.
8
.6.1 Hardware Installation
The
w
all mounting brackets must be attached to a
suitable
w
all through all mounting holes. Scre
w
sizes less
than M8 (5/16") may not be used. In order for the
w
all
mounting brackets to adequately carry the
w
eight of the
heater, it must be installed
w
ith best building practice.
Fi
g
ure 14: Linear (Horizontal)
Fi
g
ure 15: Linear (Rear View)
Model
Quantity of Wall Mountin
g
Brackets
AG15ST
3
AG20ST
4
AG25ST
4
AG30ST
5
AG35ST
5
AG40ST
5
AG45ST
6
AG50ST
6
Summary of Contents for AG15ST
Page 2: ......
Page 4: ......
Page 6: ......
Page 45: ...SECTION 11 WIRING 39 11 4 Internal Wiring Diagram ...
Page 53: ...SECTION 14 TROUBLESHOOTING 47 Troubleshooting Flow Chart Linear and Double Linear ...
Page 61: ......