
2 Installation and Commissioning
Manual TRZ 03· EN08 ·2018 September, 10th
29
2.2.2
Technical Guidline G 13
The installation conditions for new stations complying with TRG G 13 and the sim-
pler installation conditions for RMG turbine meters are compared in the table be-
low.
Type of flow
disturbance
Installation
conditions as per
TR G13
Installation
conditions for
RMG gas meters
Type TRZ03
Comments
None
Inlet pipe
5 DN
Outlet pipe
2 DN
Inlet pipe ≥ 2 DN
Outlet pipe ≥ 2 DN
The outlet pipe can also
be designed as a bend.
Inlet pipe
10 DN
Flow disturbances up-
stream of this inlet pipe
need not be considered,
if the requirement for an
alternating and pulsating
flow is fulfilled.
Bend
Inlet pipe
5 DN
Inlet pipe
2 DN
Space bend
Inlet pipe
5 DN
and
additionally,
2
perforated-plate
straighteners or one
tube-bundle
straightener
Inlet pipe
2 DN
Gas pressure
regulator with
sound attenua-
tor
Inlet pipe
5 DN
Inlet pipe
2 DN
and
additionally,
1 perforated-plate
straightener
Gas pressure
regulator without
sound attenua-
tor
Inlet pipe
5 DN
and
additionally,
2
perforated-plate
straighteners
Inlet pipe
2 DN
and
additionally,
1 perforated-plate
straightener
Diffuser
Inlet pipe
5 DN
and
additionally,
1
perforated-plate
straighteners
Inlet pipe
2 DN
Diffuser with
swirling flow
Inlet pipe
5 DN
and
additionally,
2
perforated-plate
straighteners
Inlet pipe
2 DN