WWW.RSIWW.COM
39 of 48
S-1
W-10
S-1
W-10
NOTE: VIEW FROM OUTSIDE.
NOTE: VIEW FROM OUTSIDE.
Screw two S-1 screws through V-4 panel. Line up gripping channel on other side.
Continue to screw until secure. Do not over tighten as it may damage the vent.
Repeat steps 9.2A through
9.2C to prepare second vent.
From inside, hold Window Opener closed against vent. Slide vent at an angle through opening in
roof panels. Hook top lip of vent
onto curve in ridge
profile R-1.
Outside of vent rests on top of ledge on W-10 profile. Open vent to attach the other arm of
opener to top of inside W-10 profile. Position with arm overlapping trim so adjusting screw
can move freely. Screw two S-1 screws through panel and into gripping channel on other side to
secure. Do not over tighten as it may damage the vent.
From inside screw S-6 screw and spacer into the holes
on each end of the top of the vent. This will secure the vent to the greenhouse in windy conditions.
Repeat steps 9.3A through 9.3B to install second vent.
Repeat steps 9.4A to
secure second vent.
9.2c
9.2D
9.3A
9.3B
9.4A
9.3c
9.4B
NOTE: VIEWS FROM INSIDE.
NOTE: VIEWS FROM FRONT
NOTE: VIEWS FROM INSIDE.
NOTE: VIEWS FROM INSIDE.
gripping
channel
V-4
V-4
S-1
2
Gripping Channel
QTY
S-1
4
Connector
QTY
V-4
R-1
V-4
R-1
gripping
channel
gripping
channel
V-4
W-10
2
Gripping Channel
QTY
S-1
4
Connector
QTY
V-4
W-10
R-1
S-6
S-6
S-6
V-4
V-4
S-6
S-6
4
Connector
QTY
NOTE: Make sure arm A overlaps aluminum trim on W-10