Service Manual 11
CAUTION: During the following step, hold
unit firmly until window sash is lowered to
top channel behind side panel frames.
Personal injury or property damage may
result if unit falls from window.
3. Install the Air Conditioner in the Window
a. Carefully lift the air conditioner and slide it into the open win-
dow. Make sure the bottom guide of the air conditioner drops
into the notches of the L bracket.
IMPORTANT :
When the air conditioner drops into the L bracket, the air
conditioner will be centered in window opening as shown in
Figure. 8.
b. While steadying the air conditioner, carefully bring the
window sash down behind the upper guide of the air
conditioner, as shown in Figure. 9.
4. Secure the Guide Panels
Extend the guide panels (TYPE G) to fill the window
opening using 2 screws (TYPE B), 2 screws(TYPE C) to
secure them as shown in Figure. 10.
5. Install the Sash Seal and Sash Lock
a. Cut the sash seal (TYPE F) to the window width.
Stuff the sash seal between the glass and the window
to prevent air and insects from getting into the room,
as shown in Figure. 10.
b. Fasten the L bracket using a (TYPE A) screw, as
shown in Figure. 10.
6. Window installation of room air conditioner is now
completed. See ELECTRICAL DATA for attaching
power cord to electrical outlet.
In humid weather, excess water may cause the BASE PAN
to overflow. To drain the water, remove the DRAIN CAP
and secure the DRAIN PIPE to the rear hole of the BASE
PAN. (Figure. 11)
Press the drain pipe into the hole by pushing down and
away from the fins to avoid injury.
Installation
How to Secure the Drain pipe
hang
push
1
2
DRAIN PIPE
DRAIN CAP
SEAL
WINDOW FRAME
BOTTOM
GUIDE
ABOUT
1
/
4
"
UPPER GUIDE
L BRACKET
Figure 8
Figure 9
Figure 10
Figure 11
CENTER LINE
SASH SEAL
(TYPE F)
L
BRACKET
TYPE A
TYPE B
TYPE C