![RITE-HITE Eclipse 620G Installation/Service/Owner'S Manual Download Page 7](http://html1.mh-extra.com/html/rite-hite/eclipse-620g/eclipse-620g_installation-service-owners-manual_1464587007.webp)
Rite‑Hite
®
Installation/Service/Owner's Manual
Eclipse
®
Dock Shelter (620G, 620NH)
Publication:
AMEN00141 2019-11-22
7
INSTALLATION
Side Frames
Continued
Flush Mounting
Flush Mount
Bracket
Offset =
‑1/4in [‑6mm] to
1/4in [6mm]
‘L’ Bracket
Offset Mounting
‘L’ Bracket
Bent
‘L’ Bracket
Offset =
1/2in to 3 1/2in
[13mm ‑ 89mm]
‘L’ Bracket
‘L’ Bracket
Offset =
4in [102mm] or
Greater
9in
[225mm] max
Equal
9in
[225mm] max
Equal
4 Install brackets:
NOTE:
– Side frames are supplied with brackets that
– If blockouts were supplied with the unit,
reference the blockout installation manual
(Document 1321‑0008) and this manual to
ensure proper installation of the blockouts and
the side frames
• Position the side frames on their marks
• Mark the side frame for bracket installation (3 on
Example:
Line up the mounting hole on the
bracket with a mortar joint on the wall and attach
the mounting bracket to the side frame backer
board
• Attach the brackets to the side frame backer Use
(supplied) 1/4in x 1 1/4in wood screws for wood
backers
NOTICE
4in [102mm] width side frames require protective
bumpers to be installed below the side pads
Reference
If the 4in [102mm] side frame (including blockout) has
an overall projection greater than 40in [1016mm], the
bottom, front of the blockout must be secured to either
the bumpers, the building foundation, or any other
solid rigid structure underneath the blockout This is
required to stabilize the side frames
5 Attach the side frames to the building wall, ensuring
they are aligned with the marks made in step 1
NOTICE
It is critical to mount the side frames
plumb and per
the building style
Figure 4
Figure 5