background image

Eclipse

®

 Dock Shelter (620G, 620NH)  

Installation/Service/Owner's Manual

 Rite‑Hite

®

14

 Publication:

 AMEN00141 2019-11-22

INSTALLATION

Weighted Seal, Wear Panel 

Continued

Secure Roller Seal Assembly

<Secure Roller Seal Assembly_adjpdf>

 B

 A1

 A2

 C

 D

Canopy Top

 E

1  Insert gutter panels (A1, A2) in pocket (B) located 

behind 4in [102mm] touch and hold fastener on 
weighted seal

Slide 1 HMWPE panel right (A1) and 1 HMWPE panel 

left (A2) to fill entire width of pocket.

2  Secure seal assembly and gutter panel to front bar  

in 6 places with 1 1/4in [30mm] long self drill/tap 
screws (C)

•  Do not use washers with these 6 fasteners

•  Align fasteners with tabs (D) on top edge of fabric 

flap (E).

•  Do not put screw at center location

Figure 16 

Summary of Contents for Eclipse 620G

Page 1: ...00129 Model 620G 620NH Publication AMEN00141 2019 11 22 NOTICE TO USER 2 SAFETY 3 INSTALLATION Overview 4 Preparation 5 Mounting Methods 5 Side Frames 6 Canopy Header 8 Side Curtains 12 Weighted Seal...

Page 2: ...by an authorized Rite Hite representative A Planned Maintenance Program P M P customized to your specific operation is available and recommended For a P M P contact your local Rite Hite representative...

Page 3: ...e environment or cause the equipment to operate improperly NOTE A note is used to inform you of important installation operation or maintenance information Lockout Procedure Barricade work area and po...

Page 4: ...Overview 1 Unpack and inspect unit 2 Install side frames and bracket anchors 3 Install side arms front bar and canopy top 4 Install side curtains and pocket straps 5 Install gutter roller seal and wea...

Page 5: ...lag bolt or anchor bolt through bolt method of attachment is required NOTE To determine anchor length use anchor manufacturer s recommendation for minimum anchor embedment Metal Sided Building Throug...

Page 6: ...wall at the bottom of the door opening or at dock level This mark is for the outside edge of the side frame Measure at dock level from this mark outside edge of the side frame across the door opening...

Page 7: ...allation 3 on each side of each side pad Figure 5 Example Line up the mounting hole on the bracket with a mortar joint on the wall and attach the mounting bracket to the side frame backer board Attach...

Page 8: ...bar assembly together and position across the installed side frames and mounting brackets Position it on top so the side arms on the top frame are facing the wall and land between the mounting bracket...

Page 9: ...corners where the canopy top and end cap meet are laying correctly over the edge of the mounting bracket 6 Drape canopy cover over the front bar the 2 1 2in 65mm square tubing Make sure the canopy cov...

Page 10: ...late and pipe spacers as needed on the inside of the wall so the mounting bar and the wall will flex together If structure is not aligned with 1 of the pre drilled mounting holes Drill new hole which...

Page 11: ...pare to value in the PAF If the front bar needs to be raised adjust the pin location I in the pivot arm extension NOTE Typically the bottom of the front bar is at least 12in 305mm higher than the tall...

Page 12: ...p on the outside of the side curtain completely covers and is properly aligned with the touch and hold fastener on the side frame 3 Continue to align the mounting flap to the outside of the side frame...

Page 13: ...r Seal_191004 pdf A E Roller Seal Assembly Canopy Top B D C NOTE Canopy removed for clarity 1 Position roller seal assembly so that center tabs A and top edges are aligned the full width B with the ca...

Page 14: ...1 Insert gutter panels A1 A2 in pocket B located behind 4in 102mm touch and hold fastener on weighted seal Slide 1 HMWPE panel right A1 and 1 HMWPE panel left A2 to fill entire width of pocket 2 Secu...

Page 15: ...of center foam block A A 4in 100mm overlap Flap Eclipse Manual Wear Panels_191004 pdf 1 2in 13mm MAX Side View Roller Seal Assembly Corner Wear Panel Center Wear Panel Assembly Washer Fastener Gutter...

Page 16: ...A Secure each front flap 2 1 1 4in self drill tap screws with washers Secure each corner wear panel inside screw goes through center wear panel assembly and corner wear panel 3 2in self drill tap scre...

Page 17: ...lts with expansion collar or equivalent fastener 4 anchors per bumper required Collapsible Style Draft Pad B D C D A2 A1 1 Open attachment flap s on side member A1 and back of side curtain A2 2 Align...

Page 18: ...Eclipse Dock Shelter 620G 620NH Installation Service Owner s Manual Rite Hite 18 Publication AMEN00141 2019 11 22...

Page 19: ...9 MAINTENANCE Before use inspect all parts for damage Repair and replace as required Clean wash unit with a low pressure hose or damp cloth Keep unit free of snow and ice Metal hoods are recommended t...

Page 20: ...Eclipse Dock Shelter 620G 620NH Installation Service Owner s Manual Rite Hite 20 Publication AMEN00141 2019 11 22 PARTS Exploded View 620G Eclipse Manual 620G Exploded Diagram_191004 pdf...

Page 21: ...Rite Hite Installation Service Owner s Manual Eclipse Dock Shelter 620G 620NH Publication AMEN00141 2019 11 22 21 PARTS Exploded View 620G Continued...

Page 22: ...Eclipse Dock Shelter 620G 620NH Installation Service Owner s Manual Rite Hite 22 Publication AMEN00141 2019 11 22 PARTS Exploded View 620NH Eclipse Manual 620NH Exploded Diagram_191004 pdf...

Page 23: ...Rite Hite Installation Service Owner s Manual Eclipse Dock Shelter 620G 620NH Publication AMEN00141 2019 11 22 23 PARTS Exploded View 620NH Continued...

Page 24: ...ner s premises for the purpose of repairing or replacing the Product or y return of the Product to the Rite Hite F O B Rite Hite s factory NOT WARRANTED Rite Hite does not warrant against and is not r...

Reviews: