MAINTENANCE AND OPERATION MANUAL FOR GR1 GATE
7. INSTALLATION
1.
Preparation of the site to devices assembly
Preparing and checking the assembly site by the Investor/user/buyer is aimed at efficient assembly of devices by the Investor.
PREPARATION OF THE FOUNDATION TO DEVICES ASSEMBLY
PREPARATION OF CABLE ROUTES 24V SUPPLY
Devices may be fitted on a stable foundation only, e.g. concrete,
steel construction. Cobblestone or asphalt surface are not
a stable foundation.
Cable routes shall be lead inside the foundation and outlet
above it with a 100 cm margin at points marked on drawings
(see Chapter: Sizes of devices).
PREPARATION OF CABLE ROUTES (CONTROLLING)
INSTALLATION SITE PARTITION
Cable routes shall be led inside the foundation and outlet above
it with a 100 cm margin (see Chapter: Schemes of Connections).
If the assembly is planned on a building site or inside a facility
at use, the device assembly area shall be excluded from
an unauthorised personnel’s presence.
ORGANISING PEDESTRIAN TRAFFIC FOR THE ASSEMBLY TIME
If the assembly is planned on a building site or inside a facility
at use, inconveniences connected with constrictions or
exclusions of communication tracts within passageway areas of
the devices to be assembled shall be taken into consideration
for the time from the assembly start until handover for use
.