23 |
P a g e
1.11
HEADERS INSTALLATION
1.
Lift and place the outer header into the outer U-channels between two adjacent post-top brackets.
2.
Center the header between the two posts by measuring the overhangs and moving the header until the overhang
lengths on both sides are equal.
3.
Lift and place the inner header into the inner U-channel. Align end of inner header with end of outer header.
4.
Repeat steps 1 to 3 for the opposite side of the pergola.
OUTER HEADER
INNER HEADER