17 |
P a g e
1.9
HEADERS INSTALLATION
1.
Lift and place one header with rafter ties in the U-channels on two adjacent post-top brackets.
2.
Center the header between the two posts by measuring the overhangs and moving the header until the overhang
lengths on both sides are equal.
3.
Locate the two 5/16” holes, one on each wing extension of the post-top single header bracket. Drill 3/32” X 1-1/4” deep
pilot holes at the center of the two 5/16” Holes. Locate pilot holes at the center of each 5/16” hole.