18 |
P a g e
4.
Drive one ¼ x 1-1/4” SS Hex Lag Screw through each 5/16” hole into the pilot holes you drilled in step 3, using a 7/16”
Socket and Rachet driver. Tighten down each screw.
5.
Repeat steps 1- 2 for the second header and steps 3-4 for the remaining 3 post-top single header brackets.
6.
Prepare an 11/64” drill bit to drill a pilot hole for 3/8” X 3” Lag Screws. Wrap tape around the drill bit shaft 3” from the
end of the drill bit. While drilling the pilot hole, the tape will indicate when you have reached the required depth.