15 |
P a g e
6X6 HEADERS INSTALLATION
1.
Lift and place one 6x6 header into the U-channels of adjacent post-top brackets.
2.
Locate the two 5/16” holes on each vertical face of the U-channels holding the 6x6 header. Drill 3/32” X 1-1/4”
deep pilot holes at the center of four 5/16” Holes. Locate pilot holes at the center of each 5/16” hole.