23
FLUE REQUIREMENTS - INSTALLING
The following flue manufacturers with their specific brands listed below are approved for use
with the
Continuum 11i (11i-fp)
and
Continuum 14i (14i-fp)
water heaters.
UBBINK
Horizontal flue kit;
Vertical flue kit;
Warnings:
Before installation inspect each flue component for damage and correct seal placement. Do
not attempt to fix or install any damaged component.
Improper installation of flue systems and components, or failure to follow all installation
instructions can result in property damage or serious injury.
The Rinnai Continuum 11i (11i
-
fp) and Continuum 14i (14i
-
fp) are for internal installation in
conjunction with the Rinnai flue system.
The flue must be installed in accordance with:
-
Manufacturers Installation Instructions;
-
British Standards including BS5440;
-
Gas Safety (Installation and Use) Regulations;
-
IGE/UP/10 Part1 Edition 2;
-
Building Regulation J.
Such other specifications and regulations that may supersede or complement the above
documents.
The flue must be installed by a competent, authorised person. It is the installer’s
responsibility to ensure that the unit has been installed to all current requirements.
Location of the appliance flue terminal must be in accordance with the clearances shown in
the latest version of BS5440
-
1.Table and Figure C.1 is provided for your guidance on
page
24
The flue terminal should be over 2m from ground level whenever possible.
For lower installations a terminal guard must be installed.
Summary of Contents for REU-1110FFU(F)-E
Page 8: ...8 OPERATION...
Page 17: ...17 MAIN COMPONENTS...
Page 29: ...29 DIMENSIONS...
Page 32: ...32 FLOW CHART...
Page 33: ...33 WIRING DIAGRAM REU 1110FFU E REU 1110FFU F E...
Page 35: ...35 WATER FLOW CHARACTERISTICS REU 1110FFU E REU 1110FFU F E...
Page 36: ...36 LETTER OF COMPLIANCE...
Page 37: ...37 CE CERTIFICATE...
Page 39: ...39 COMMISSIONING CHECK LIST COMMISSIONING SHEET...
Page 40: ...40 SERVICE RECORD...