Rinnai
9
HW_CF_FFPP_FIM
VERTICAL FLUE
The Vertical Flue option (Fig. 12) is used for flueing
vertically through the roof and FFPPROOFCOWL and
FFPPPIPE1000
MUST
be used for this purpose.
Components included with FFPPROOFCOWL are:
terminal pipe, 2x UV protectors and 1x pipe clip.
Components included with FFPPPIPE1000 are: flue
pipe, 1x pipe clip.
Installation Method
IMPORTANT
Refer to "Flue Length, Bends & Appliance
Settings" on page 6 for flue run length
limitations.
Ensure there is enough space to install
the water heater, flue assembly and pipe
work. Also ensure that the positioning
of the flue terminal complies with the
requirements of AS/NZS 5601 AS/NZS
5601 (see page 12).
Refer to "Appliance Spigot Dimensions
& Centres" on page 5 when creating
access holes through floors and ceilings
for flue pipe components.
1. Mount the water heater in an appropriate location.
2. Set plumb bob from the centre of the heater flue
outlet to ceiling marking position. Cut 140mm hole
in plasterboard (or a suitable 'oval' for pitched roof
applications). Repeat this step for underside of
roofing.
3. Install, the UV adaptor and the UV protectors into
the underside of the flue shroud (trimming to fit
where necessary), refer to "UV Roof Protectors"
on page 6.
4. Calculate the required number and combination
of FFPPPIPE1000 lengths and cut to size as
required, see Fig.1, in section "Cutting The Flue
Components" on page 5.
5. Install decktite roof seal (Not supplied).
6. Ensure the flue is fully supported independently
of the appliance, by the use of suitable clips or
brackets, in accordance with AS/NZS 5601.
Appropriate standoff brackets are supplied with
each FFPPROOFCOWL and FFPPPIPE1000
component.
7. Ensure that the appliance can be removed without
causing movement or displacement of the flue, in
accordance with AS/NZS 5601.
8. All PVC joints must be secured with the three (3)
self tapping screws supplied with the component
as shown in Fig. 13.
9. Connect condensate drain (go to "Condensate
Drain" on page 10 for connection details).
Fig. 14
Fig. 12
FFPPPIPE1000
FFPPROOFCOWL
Includes: UV Adaptor (x1), UV Protector (x2)
and Pipe Cilp / Wall bracket (x1)
FFPPPIPE1000
FFPPPIPE1000
Pipe Clip
x1 supplied with
FFPPPIPE1000
FFPPPIPE1000
FFPPWALLKIT
FFPPBEND90
Pipe Clip
x1 supplied with
FFPPPIPE1000
Pipe Clip
x1 supplied with
FFPPPIPE1000
3˚ fall towards
water heater
Fig. 13
Pipe clip
x1 supplied with
FFPPPIPE1000
FFPPROOFCOWL
Includes: UV Adaptor (x1), UV Protector (x2)
and Pipe Cilp / Wall bracket (x1)
Ensure the UV
protectors are
installed outside
of the decktite
(not supplied).
FFPPBEND90
FFWSEAL
FFPPPIPE1000
Pipe clip
x1 supplied with
FFPPPIPE1000
FFPPBEND45
FFWSEAL
Ensure the UV
protectors are
installed outside
of the decktite
(not supplied).
Pipe Clip
x1 supplied with
FFPPPIPE1000
FFPPPIPE1000
FFPPBEND90
x1 supplied with
FFPPWALLKIT
INSTALLATION METHODS
Summary of Contents for HD210i
Page 14: ...Rinnai 14 HW_CF_FFPP_FIM NOTES...
Page 15: ...Rinnai 15 HW_CF_FFPP_FIM NOTES...