Rinnai HD210E Operation & Installation Manual Download Page 22

Rinnai 22 

Commercial Manifold Pack OIM

Company
Phone No,
Email
Date
Project

COMMERCIAL HOT WATER SYSTEM COMMISSIONING CHECK-LIST

System Details
Product Code

Installation Type

External / Internal

Number of Water Heaters
Water Heater Model
Gas Type

Natural / LPG

Number of Storage Tanks
Storage Tan/s Model
Number of Primary Pump/s & Control System/s
Pump/s Model
Number of Return Pump/s
Pump/s Model

Installation

Overall Installation – Satisfactory?

Yes / No

Cold Water Strainer, Check Valve, PLV Isolation

Valve/s Installed?

Yes / No

Return Strainer Installed?

Yes / No / NA

Storage Tanks’ hydraulically balanced?

Yes / No / NA

Ventilation Requirements – Satisfactory?

Yes / No

Individual Co-Axil Flue Installation – Satisfactory?

Yes / No / NA

Dip Switch Setting

Short / Long

Common Flue Installation – Satisfactory?

Yes / No / NA

Primary Pump/s Vented?

Yes / No / NA

Return Pump/s Vented?

Yes / No / NA

Air removed from flow and return hydraulic circuit?

Yes / No

All drains to tundish completed?

Yes / No

Socket Outlet Installation – Satisfactory?

Yes / No / NA

MECs/Cascade staging system wiring completed?

YES / No / NA

Parameters

Gas Pressure (@1.13-2.75kPa–NG) / @2.75kPa-LPG)

• 

Static

• 

Running

Inlet Water Pressure (kPa)
Permanent Power Supply (V/Phase/Hz/A)

240/1/50

COMMISSIONING 

Summary of Contents for HD210E

Page 1: ...Commercial Manifold Pack Operation Installation Manual...

Page 2: ...spection and Maintenance Not suitable as a pool or spa heater This manual must be read and understood before installation commissioning and operation of water heaters and flue systems are attempted Th...

Page 3: ...or Internal Models 11 Multiple Flue Terminals 12 Installation Options 13 Manifold Pack with no reticulation system 16 Manifold Pack with reticulation system 16 Specifications 17 Typical Rinnai Manifol...

Page 4: ...fore reading the manufacturers instructions This appliance must be installed commissioned and serviced by an authorised person in accordance with all applicable local rules and regulations For continu...

Page 5: ...ce is NOT intended for use by persons including children with reduced physical sensory or mental capabilities or lack of experience and knowledge unless they have been given supervision or instruction...

Page 6: ...ldren disabled and the elderly are at the highest risk of being scalded Feel water temperature before bathing or showering Scalds from hot water taps can result in severe injuries to young children Sc...

Page 7: ...sers are surprised at the amount of hot water used especially when showering If the amount of hot water used during the day exceeds the capacity of the hot water system it is likely that there will be...

Page 8: ...he same MJ rating HD28E HD250E HD210E EXTERNAL MODELS These appliances are designed for Outdoor Installation only As such each must be located in an above ground open air situation with natural ventil...

Page 9: ...t be in accordance with Section 6 of AS NZS 5601 and the FLUEING FOR INTERNAL MODELS on page 11 HORIZONTAL OBSTRUCTIONS AS NZS 5601 2010 Gas Installations stipulates a minimum horizontal clearance of...

Page 10: ...her projections FIGURE 6 2 in part LOCATION OF FLUE TERMINALS OF BALANCED FLUE ROOM SEALED FAN ASSISTED OR OUTDOOR APPLIANCES n j Horizontally from an openable window door non mechanical air inlet or...

Page 11: ...g can be used as a direct wall flue or extended from another internal wall Vertical flueing is used when the water heater needs to be flued vertically through the roof A condensate trap may be require...

Page 12: ...FLUE TERMINALS Dimension H in AS NZS 5601 Figure 6 2 does not apply when multiple Rinnai external water heaters of the same model are installed on the same vertical face with flue terminals at the sam...

Page 13: ...Installation Manual RINNAI FLUE HEADER S NATURAL DRAFT FLUE PIPE SUPPLIED BY OTHERS ALREADY INSTALLED CERTIFIED FLUE COWL CONDENSATE DRAIN WHERE NECESSARY RINNAI ADJUSTABLE SLEEVE OR EQUIVALENT MULTIP...

Page 14: ...is supplied in modules of either 2 or 3 HD continuous flow units plumbed in parallel and mounted on a dedicated and lightweight frame Standard systems can be installed together in any order by couplin...

Page 15: ...rce module s prior to joining the pipework The heat source can also be installed in a back to back configuration using DDFJOINKIT Again if you are installing an internal plant flue design and the asso...

Page 16: ...close the cold water valve underneath the currently operating heaters to restrict the flow Other heaters should then fire up Clean all filters on completion MANIFOLD PACK WITH RETICULATION SYSTEM Tur...

Page 17: ...eight HD200 Manifold Packs MP2 28 375 750 280 340 440 540 1500 850 60 Kg MP3 28 1125 90 Kg MP4 28 1500 120 Kg MP5 28 1875 150 Kg MP6 28 2250 180 Kg HD210 Manifold Packs MP2 210 500 1000 310 340 440 54...

Page 18: ...ards the cold pipe should be insulated Gas Supply Check gas type of Rinnai HD water heater matches gas supply available LPG or Natural on job site Gas inlet connection is the top pipe on a MP manifold...

Page 19: ...fore increasing the flow rate through the remaining heaters Extra heaters are fired as the flow rate increases The staging control system also rotates the sequence of operation to share the load acros...

Page 20: ...linder Check there are no obstructions to the flue outlet 14 Heat Exchanger Overheat Failure Service Call 15 Venturi Control Failure Service Call 16 Over Temperature Warning Service Call 17 Venturi Bl...

Page 21: ...d by Rinnai Co axial flueing not being pushed together properly and exhaust gases are re entering the inlet air Check flue connections Also inspect flue terminal for any cause to divert exhaust air ba...

Page 22: ...Installed Yes No Return Strainer Installed Yes No NA Storage Tanks hydraulically balanced Yes No NA Ventilation Requirements Satisfactory Yes No Individual Co Axil Flue Installation Satisfactory Yes...

Page 23: ...three monthly from there onwards For other details refer to Operation Maintenance Manual For effective operation of the system service the package once every six 6 months as per the manufacturer s in...

Page 24: ...e Tel 1800 000 340 Cost of a local call higher from mobile or public phones For further information visit www rinnai com au or email enquiry rinnai com au Rinnai has a Service and Spare Parts network...

Reviews: