Packaging and transportation
4.1 Scope of delivery
The boiler is supplied ready for use.
•
Please check if the packaging is intact.
•
Check if all the items listed are included in the delivery.
The supply kit contents:
!
CAUTION
4.2 Transportation
The boiler may be damaged when not secured properly.
- Only transport the boiler using appropriate transportation equipment, such as a
handtruck with a fastening belt or special equipment for maneuvering steps.
- When shipping the boiler must be secured on the transportation equipment to
prevent it from falling off.
- Protect all parts against impacts if they are to be transported.
- Follow the transportation markings on the packaging.
•
Packaged boilers must always be lifted and carried by two people, or you must
use a handtruck or special equipment for transport.
Part No.
Description
Amount
E50C
Install Parts Bag E50C:
804000088
Boiler with:
44839200
ARV1215U
Outdoor reset sensor ARV12
1
44215900
Compression ring Ø22 brass
4
44237500
Compression ring Ø15 brass
4
44357010
Screw 4,8X16mm
4
44380900
Line voltage input connector 3 pole grey
1
44457400
Nut W1.1/8x1/14 22 Compression fitting
2
44527600
Cap de-aerator
1
44748300
Flow restriction MR01 FG 7,6L white
1
44765910
Adapter fitting 15mm x 3/4"NPT ext.
2
44786700
Water lock 1/2"NPT x 1/4"NPT
1
44786800
T/P Gauge 1/4"NPT
1
44786900
Safety valve 3/4"NPT
1
44840100
Adapter fitting 22mm x 1"NPT ext.
2
71035700
Nut 15mm compression fitting
2
Wall mounting suspension bracket
1
8U51650x
Installation & Service Instructions
1
8U52650x
User information manual
1
8U304000
Warranty document
1
8U300600
ICSL book