COMMERCIAL HOT WATER SYSTEM COMMISSIONING CHECK-LIST
System Details
Product Code
Installation Type
External / Internal
Number of Water Heaters
Water Heater Model
Gas Type
Natural / LPG
Number of Storage Tanks
Storage Tan/s Model
Number of Primary Pump/s & Control System/s
Pump/s Model
Number of Return Pump/s
Pump/s Model
Installation
Overall Installation – Satisfactory?
Yes / No
Cold Water Strainer, Check Valve, PLV Isolation
Valve/s Installed?
Yes / No
Return Strainer Installed?
Yes / No / NA
Storage Tanks’ hydraulically balanced?
Yes / No / NA
Ventilation Requirements – Satisfactory?
Yes / No
Individual Co-Axil Flue Installation – Satisfactory?
Yes / No / NA
Dip Switch Setting
Short / Long
Common Flue Installation – Satisfactory?
Yes / No / NA
Primary Pump/s Vented?
Yes / No / NA
Return Pump/s Vented?
Yes / No / NA
Air removed from flow and return hydraulic circuit?
Yes / No
All drains to tundish completed?
Yes / No
Socket Outlet Installation – Satisfactory?
Yes / No / NA
MECS/Cascade Staging System wiring completed?
YES / No / NA
Parameters
Gas Pressure (@1.13-2.75kPa–NG) / @2.75kPa-LPG)
•
Static
•
Running
Inlet Water Pressure (kPa)
Permanent Power Supply (V/Phase/Hz/A)
240/1/50
COMMISSIONING