Demand Duo
™
R
-
Series Installation and Operation Manual
35
Single Unit Circulation
Note:
Installation must conform to applicable codes and all requirements listed in this manual. Balancing valves, equivalent piping , pressure gauges,
and temperature gauges are to be used as necessary to ensure proper flow between units.
All components shall be selected for the pressure and temperature rating of the installation.
Gas Supply
Cold Water Supply
Tankless PRV
Tank T&P
Pipe T&P to Open Drain
Hot Water Supply Line
Building
Circulation
Pump
Building Hot
Water
Return Line
(Optional)
6 inch. B
-
Vent
Figure 32