Demand Duo
™
R
-
Series Installation and Operation Manual
3
1.
Welcome
..................................................................................................................................
4
2.
Safety
.......................................................................................................................................
5
2.1 Safety Symbols
...................................................................................................................
5
2.2 Safety Precautions
..............................................................................................................
5
3.
About
........................................................................................................................................
7
3.1 Components
.......................................................................................................................
7
3.2 Specifications
.....................................................................................................................
8
3.3 Dimensions
.........................................................................................................................
10
4.
Installation
................................................................................................................................
12
4.1 Installation Guidelines
.........................................................................................................
12
4.2 What You Will Need
............................................................................................................
13
4.3 Choose an Installation Location
..........................................................................................
13
5. Venting
......................................................................................................................................
16
5.1 Venting Guidelines
..............................................................................................................
16
5.2 Combustion Air Requirements
.............................................................................................
21
5.3 Venting Installation Checklist
...............................................................................................
24
6. Gas and Power Supply
..............................................................................................................
25
6.1 Connect the Gas Supply
.....................................................................................................
25
6.2 Gas Operating Instructions
..................................................................................................
27
6.3 Gas Pipe Sizing Reference Tables
......................................................................................
28
6.4 Connect Electricity
..............................................................................................................
29
6.5 System Controller
...............................................................................................................
31
6.6 Checklist for Gas and Electricity
..........................................................................................
32
7. System Plumbing
......................................................................................................................
33
7.1 Pressure Relief Valve Requirements
...................................................................................
33
7.2 Temperature
-
PRV Requirements
........................................................................................
33
7.3 Typical Installations
.............................................................................................................
34
7.4 Piping Diagram for Basic Installations
.................................................................................
35
7.5 Piping Diagram for Multiple Unit Installations
.......................................................................
36
7.6 Connect the Water Heater to the Water Supply
...................................................................
37
7.7 Plumbing Checklist
.............................................................................................................
37
8. Post
-
Installation Checklist
..........................................................................................................
38
9. Operation
..................................................................................................................................
39
9.1 Safety Precautions
..............................................................................................................
39
9.2 Control Panel
......................................................................................................................
40
9.3 Basic Operation Settings
.....................................................................................................
41
10. Maintenance
............................................................................................................................
43
10.1 Diagnostic Codes
..............................................................................................................
44
10.2 Service/Maintenance Log
..................................................................................................
47
11. Warranty
.................................................................................................................................
49