Installation Information - General
Before installation
Unpack the appliance and components and check for damage. DO NOT install any
damaged items.
Check all components have been supplied and that you have the correct gas type.
Read these instructions to get an overview of the steps required before starting the
installation. Failure to follow these instructions could cause a malfunction of the system.
This could result in serious injury and property damage.
The cylinder should be installed to AS/NZS3500.4, with reference to G1/AS1 where
appropriate.
Base requirements
Access to system
Catch pan
Flue clearance
Electricity
The cylinder should be installed on a flat level base of sufficient
strength to support the weight of the water heater when full. It must
also be restrained against seismic activity.
The Demand Duo Lite system should not be located where it will
be difficult to remove. Where a system is not easily accessible for
maintenance and replacement, the Rinnai Warranty will not cover any
additional costs caused by access difficulty.
It’s important a suitably drained catch pan is fitted where damage
could be caused by discharge from the cylinder.
This is a power flued appliance and flue clearances must comply
with NZS:5261, “Table 16 - Minimum clearances required for flue
terminals”.
A single 10 amp outdoor power point is required adjacent to the
installation.