Rinnai Commercial Hybrid System Installation and Operation Manual
45
□
The water heater is not subject to corrosive
compounds in the air.
□
The water supply does not contain chemicals or
exceed total hardness that will damage the heat
exchanger.
□
Clearances from the water heater unit are met.
□
Clearances from the vent termination / air intake
are met.
□
Ensure you have used the correct venting
products for the model installed and that you
have completely followed the venting
manufacturer
’
s installation instructions and these
installation instructions.
□
Verify that the vent system does not exceed the
maximum length for the number of elbows used.
□
Purge the water line of all debris and air by
closing the hot isolation valve and opening the
cold isolation valve and its drain.
Debris will
damage the water heater.
Use a bucket or hose if
necessary.
□
Ensure that hot and cold water lines are not
crossed to the unit and are leak free.
□
A manual gas control valve has been placed in the
gas line to the water heater.
□
Ensure that a pressure relief valve is installed with
a rating that exceeds the BTU input of the water
heater model. Refer to the rating plate on the
side of the water heater for BTU input.
□
Clean the inlet water filter by closing the cold and
hot water inlet isolation (shut
-
off) valves. Put a
bucket under the filter at the bottom of the water
heater to catch any water that is contained inside
the unit. Unscrew the water filter. Rinse the filter
to remove any debris. Install the filter and open
the isolation valves.
□
Check the gas lines and connections for leaks.
□
Confirm that the gas inlet pressure is within
limits.
□
Confirm that the water heater is rated for the gas
type supplied.
□
Confirm that the electricity is supplied from a 120
VAC, 60 Hz power source, is in a properly
grounded circuit, and turned on.
□
Verify the temperature controller is functioning
properly.
□
Confirm parameter settings are set appropriately
for the altitude.
□
Verify the system is functioning correctly by
connecting your manometer to the gas pressure
test port on the water heater. Operate all gas
appliances in the home or facility at high fire. The
inlet gas pressure at the water heater must not
drop below that listed on the rating plate.
□
DO NOT
introduce toxic chemicals such as those
used for boiler water treatment to the potable
water used for space heating.
□
If the water heater is not needed for immediate
use, then drain the water from the heat
exchanger.
□
Install the front panel.
□
Explain to the customer the importance of not
blocking the vent termination or air intake.
□
Explain to the customer the operation of the
water heater, safety guidelines, maintenance, and
warranty.
□
The installation must conform with local codes or,
in the absence of local codes, with the
National
Fuel Gas Code, ANSI Z223.1/NFPA 54
, or the
Natural Gas and Propane Installation Code, CSA
B149.1
.
□
Leave this manual and the entire C199 manual
taped to the water heater, or give both manuals
directly to the consumer.
Post
-
Installation Checklist
9