3. INSTALLATION AND COMMISSIONING
3.1.Packaging and Handling
ONGAS MEGA Series condensing boilers are dispatched as covered with sheets coated with powder-
static paint, wrapped with stretch film, on pallets and inside crates. Appropriate markings are provided
on the case. During storage, it may be stored at proper ambient humidity and temperature without
opening the package.
Recommended minimum distances for floor type boilers:
ONGAS Mega Series condensing boilers shall be placed as follows;
•
Place the boiler to the boiler room taking the minimum recommended distances into account.
•
Remove the gelatin, tapes, pallets and any other packaging.
•
All gas appliances shall be installed by authorized persons as required by law. Any error in the
installation of these devices may cause loss of life and property.
•
Boilers shall be installed in a place with no risk of frost. When the boiler is not operated, the
water remaining in the radiators shall be drained to prevent freezing.
•
Boilers shall not be installed in a location that contains moisture, vapor or dust. Otherwise the
boiler shall not operate correctly and efficiently.
Summary of Contents for ONGAS MEGA 05
Page 2: ...2...
Page 15: ...15 2 1 Spare part of the ONGAS MEGA Floor Type Condensing Boiler...
Page 16: ...16...
Page 17: ...17...
Page 43: ...43 5 5 Wiring Diagrams...
Page 55: ...55 8 1 Rima Condensing Boiler Commissioning Form...
Page 58: ...58 8 3 Operating Instructions...