Boiler repairs

The boiler may be  repaired by an  authorized   service  technician  or organisation  only. The user or owner

may do only normal  maintenance and simple replacements of some  parts–e.g. sealing cords.

Please note   

When repairing the boiler, original parts must always be used.

Warranty and Warranty Conditions

S.MAX  boilers  are  covered  by  warranty  specified  in  the Warranty  Certificate, Service Book  and  User and

Installation Guide ( chapter Introduction, Installing the boiler ).

Boiler delivery

Rima S.MAX boilers are supplied completely assembled and functionally tested.

The delivery includes :   

1. Boiler

2. Operating and Installation Instructions

3. Service Book

4. List of service centres

5. Warranty Certificate

6. Thermo-mechanical output regulator

7 Cleaning kit (brush poker)

7. Cleaning kit (brush, poker)

Installation Instructions   

Boiler installation - General information 

S.MAX  boilers  must  be  put into  service  by  an  authorized  services.  A   network  of  authorized service

organisations  which  meet  these conditions is  available for all  boiler installations,  putting them into  service

and  for warranty repairs. These  networks are  organised by Önmetal's agreed distributors outside of Turkey.

The boiler is designed to supply  heating systems with  gauge  pressure up to  400 kPa  which use water that 

meets the  requirements  of  related  standarts ( under no  circumstances may the water be acidic, i.e. it must

have pH>7, and it should have minimum carbon hardness).

have pH>7, and it should have minimum carbon hardness).

The heating system must be designed in such a way  that hot water can circulate all the time through at least

some of the radiators.

Antifreeze  fluids – because of  their  unsuitable   properties, we do not recommend to use them.They have a 

reduced  ability to transfer heat, have  large  volumetric  expansion, age and  damage rubber  components. If 

under concrete circumstances there is no other option how to reliable prevent .

B f

fi

l i

t ll ti

th h

ti

t

di t ib ti

i i

t b fl

h d

l ti

ith

i

d

Before final installation, the heating system distribution piping must be flushed several times with pressurised

water. In old,already used systems,the flushing must be done in opposite direction to the hot water circulation.

In new systems, all radiators must be  cleaned from conservation material

and rinsed with warm water under 

pressure.

We recommend installing a sludge trap upstream of the boiler (i.e. on hot water return pipe ). The sludge trap

design should allow emptying in regular intervals, without the need to drain a lot of hotwater. The sludge  trap

may be  combined  with a  filter;  however, a  filter alone  will  not provide an adequate protection.

17

Summary of Contents for S.MAX Series

Page 1: ...S MAX SERIES SOLID FUEL BOILER S MAX SERIES SOLID FUEL BOILER 0 S MAX REV 01 2010 0036 0036...

Page 2: ...fire 12 Setting outlet water temperature 13 Stoking 13 Overnight heating mode 13 Removing solid combustion residuals 13 Dewing and tarring 14 Boiler shutdown 14 Short term shutdown 14 Long term shutd...

Page 3: ...Information on the boiler plate The boiler Serial No is shown on the plate which is attached to the cover panel of the cast iron body 2...

Page 4: ...Boiler dimensions Boiler packaging dimensions 3...

Page 5: ...Technical parameters 4...

Page 6: ...ted equipment 6 The service technician putting the boiler into operation for the first time must show the user the various parts of the boiler and how to control the boiler with the boiler safety elem...

Page 7: ...d up with ice do not attempt to start up the boiler until normal operating conditions have been restored Ensuring safety of equipment and people The boiler and all accessories complies with the requir...

Page 8: ...d with necessary pipe sections for water connection It also has brackets for fitting thermostat sensors and brackets on feet for fastening the boiler to the base Attached to the cast iron boiler body...

Page 9: ...utlet from the boiler cast iron body It detects temperature of the hot water and regulates the supply of primary combustion air to underneath the boiler stoker by opening or shutting a flap situated i...

Page 10: ...Fig 7 Keep object s away from regulation hatch s front and channels for allowing primary air o t a d c a e s o a o g p a y a transfer Supply of secondary combustion air is controlled by an air rosett...

Page 11: ...ows the indications for inlet and drain shown on the valve must be followed Maximum temperature of the input water for temperature safety valve is 15 C and minimum water pressure Maximum temperature o...

Page 12: ...Check Valve 6 Four Way Mixing Valve 7 System Pump 8 Heating System 9 Open Expansion Tank Open type expansion tank must be equipped with the highest level in the entire hydraulic system The expansion...

Page 13: ...em water at the rate of 15 Please note The failure to meet this requirement may lead to the heat exchanger getting clogged up and the cast iron block may crack as a result During the heating season a...

Page 14: ...e boiler outlet is controlled Stoking First shut the regulating hatch this will shut supply of combustion air into the boiler Then open the chimney flap completely Partially open the stoking door and...

Page 15: ...hutting the boiler down clean it remove all combustion residuals empty the ashtray clean the stoking door contact surfaces and the ash compartment and then shut the boiler s stoking door and ash compa...

Page 16: ...ning and closing Boiler burning room and possible soot layers on smoke channels are checks and cleanings Boiler cleaning Wh th b il i d t d fi h l t th b il ll i l h t h ib Sensor of the pressure test...

Page 17: ...fig 12 fig 13 fig 14 fig 15 16...

Page 18: ...eating systems with gauge pressure up to 400 kPa which use water that meets the requirements of related standarts under no circumstances may the water be acidic i e it must have pH 7 and it should hav...

Page 19: ...om cellar corridor and in habitable rooms The room in which the boiler is located must have a permanent supply of air necessary for the combustion process The air must be free of halogen hydrocarbons...

Page 20: ...r room and allow manipulations with the boiler such as cleaning and stoking The distance between the front of the boiler and the wall should be at least the boiler length L plus 500 mm Minimum distanc...

Page 21: ...nto the back section Screw the flue adapter with smoke flap onto the boiler combustion gases outlet Put a flue over the flue adapter and insert it into the chimney connection hole The flue diameter is...

Page 22: ...SMAX boiler parts fi 18 fig 18 fig 19 21...

Page 23: ...Spare parts list p p fig 20 22...

Page 24: ...ss than 300 L Transportation and storage The manufacturer handles the boiler that is on a palette and secured against shifting with screws The boiler may not be transported in a different position tha...

Page 25: ...arnings A sufficient flue draft of the flue gas system is the basic requirement for the correct functioning of the boiler It fundamentally affects its performance and efficiency Therefore heed the fol...

Page 26: ...combustion products and the outside atmosphere We recommend the use of a chimney liner Have precise calculations carried out by a heating engineer or flue installer Coefficent 0 041 for wood Coeffice...

Page 27: ...Address Ikitelli Organize Sanayi Bolgesi Ataturk Bulvari 17 Cad No 5 ISTANBUL TURKEY Phone 90 212 485 48 74 Fax 90 212 485 48 73 Web www rima com tr e mail info rima com tr www onmetal com tr...