RIKA REVO II PGI Operating Manual Download Page 8

8

Dimensions of REVO II RAO/PGI

B

H

F-S

F-H

T

RO-T3

RO-S

RO-H

R-

F-

Dimensions

RAO

PGI

Height

[mm]

1090

1090

Width

[mm]

532

532

Corpus depth

[mm]

578

578

Weight

Weight without shell

[kg]

145

145

Weight with stones

[kg]

230

230

Flue pipe connection

R - Ø Flue pipe outlet

[mm]

100

100

RO - H connection height

[cm]

24

30

RO - T1 original angle pipe total depth [cm]

-

-

RO - T2 original angle pipe distance 
to rear wall

[cm]

-

-

RO - T3 Depth from rear wall to 
middle of flue pipe

[cm]

17

17

RO - S original angle pipe side 
distance

[cm]

11

11

R - H rear connection height

[cm]

-

-

R - S rear connection side distance

[cm]

-

-

Fresh air connection

F - Ø Diameter

[mm]

60

60

F - H Connection height

[cm]

27

27

F - S Side distance

[cm]

19

19

Amount of Fuel

Nominal 

load

Part load

Amount of fuel

~1,9 kg*

~0,6 kg*

Burn time at full pellet hopper

~18 h*

~57 h*

*Practical values   may vary depending on pellet quality�

Note

Pellet consumption depends on the size of the pellets� The larger 
the pellets, the slower the feed and vice versa�

Technical data for REVO II RAO/PGI

Technical data

Heating power range

[kW]

2,5 - 8

Room heating capacity (depending 
on house insulation)

[m3]

50 - 220

Fuel consumption

[kg/h]

till 1,9

Pellet container capacity*

[l]/[~kg]

39/~25

Electric supply

[V]/[Hz]

230/50

Average electrical input

[W]

~20

Fuse

[A]

2,5 AT

Efficiency

[%]

93,2

CO

2

[%]

13,1

CO-emission on 13% OO

2

[mg/m

N

3

]

84

Dust emission

[mg/m

N

3

]

8

Exhaust

[g/s]

4,8

Exhaust temperature

[°C]

150,1

Chimney draft requirement

[Pa]

3

*The capacity in kg may deviate due to different pellet bulk 
densities�

The owner of small firing systems or the person authorised for the 
small firing system is to keep the technical documentation and is to 
submit it to the authorities or the chimney sweep on request�

Note

Please observe the national and European standards as well as 
local regulations concerning the installation and operation of 
firing installations!

Packaging

Your first impression is important to us!

The packaging of your new stove provides excellent protection 
against damage� However damage to the stove and accessories 
may still occur during transport�

Note

Therefore please check your stove on receipt for damage and 
completeness! Report any deficiencies to your dealer immediately! 
Pay particular attention during unpacking that the stone panels 
remain intact� Scratches to the material can easily occur� Stone 
panels are excluded from the warrant�

The packaging of your new stove is environmentally neutral to a 
great extent�

Tip

The wood used in the packaging has not been surface treated� 
The cardboard and film (PE) can be disposed of via the municipal 
waste collection for recycling�

Electrical connection

The stove is supplied with an approx� 2 m long connecting cable 
with a Euro-plug� This cable is to be connected to a 230 Volt / 50 Hz 
socket� The average electrical power consumption is some 20 Watt in 
heating operation� And approx� 150 Watt during automatic ignition� 
The connection cable must be laid so that there is no contact to any 
sharp edges or hot surfaces of the stove�

Summary of Contents for REVO II PGI

Page 1: ...PGI only for France Belgium Switzerland REVO II RAO REVO II PGI Operating manual...

Page 2: ...fety information 10 First heating 10 Safety distances 10 Prior to set up 11 The correct chimney connection 11 4 BRIEF INFORMATION ON FUEL PELLETS 12 What are pellets 12 Wood pellet specification accor...

Page 3: ...ot daily 17 Cleaning the door glass 17 Cleaning painted surfaces 17 9 CLEANING 18 Cleaning the convection air openings 18 Combustion air intake 18 Cleaning the pellet container 18 Bearings 18 Checking...

Page 4: ...Spare part overview exploded diagram 34 33 31 36 35 22 22 23 37 20 19 24 32 30 25 26 27 28 29 21 43 48 49 45 40 44 39 38 47 41 42 46 2 1 15 17 8 11 18 9 10 12 13 3 4 6 5 7 14 16...

Page 5: ...51 51 96 50 50 72 71 70 86 85 83 59 65 79 61 61 64 64 63 63 62 62 75 68 69 66 67 68 69 59 59 78 77 76 59 73 74 82 81 80 92 93 94 95 88 89 90 55 55 55 52 52 52 84 54 56 57 53 54 56 57 88 89 87 54 56 57...

Page 6: ...5 156 149 151 148 147 146 150 154 153 152 160 161 162 163 165 164 119 120 122 121 123 124 125 115 114 111 110 112 113 126 128 127 108 106 107 104 129 130 133 132 103 104 100 118 117 101 102 105 116 10...

Page 7: ...2502 Self tapping screw 82 Z35691 Spring plug 83 L03551 Side casing panel back right 84 Z37702 Soapstone right Z37911 Sandstone right Z37705 Stone white right 85 N112134 Self tapping screw 86 Z37910 C...

Page 8: ...requirement Pa 3 The capacity in kg may deviate due to different pellet bulk densities The owner of small firing systems or the person authorised for the small firing system is to keep the technical...

Page 9: ...N13384 2 Use only insulated double stainless steel tubes flexible aluminum or steel tubes are not permitted An inspection door for regular inspection and cleaning must be present The flue pipe connect...

Page 10: ...g non heat resistant objects on the stove or near it is prohibited Q Q Do not place clothing on the stove to dry Q Q Laundry racks etc must be placed at a sufficient distance to the stove ACUTE DANGER...

Page 11: ...1 wind break 2 chimney 3 inspection opening For the selection of the connection and to ensure a proper connection between the stove and chimney please read the guide INSTALLING THE STOVE or ask your...

Page 12: ...h a lignotester internal control Your pellet stove is only approved for the burning of pellets of tested quality Please ask your pellet stove dealer for tested fuel and a list of monitored fuel manufa...

Page 13: ...aning cycle The speed of the flue gas fan is increased every hour for a short period to blow ash from the burn pot increasing the operational safety The status indicator CLEAN appears on the display O...

Page 14: ...hments Select soft bases to prevent scratches to your living space furniture and stove panels Disassembly rear side panel Open the pellet container lid In this position it remains open Remove the 2 he...

Page 15: ...The stone tilts forwards Lift him carefully up to remove Pay attention to the combustion chamber door Loosen the hexagonal screw only on one side Tilt the stone carefully sidewards and lift him up Rep...

Page 16: ...ontrol of your stove is to be assumed by an external room thermostat you have to connect your external room thermostat 1 instead of the standard integrated cable bridge 2 The connected room thermostat...

Page 17: ...flame temperature sensor Remove the dust deposits from the sensor at regular intervals Use a clean cleaning cloth or newspaper Cleaning of the burn pot daily Make sure that the air vents are not block...

Page 18: ...over the convection fins Combustion air intake If necessary please also clean the air intake with a hoover Note Only when the stove is cold You could vacuum out embers FIRE RISK Cleaning the pellet co...

Page 19: ...k in false air via incorrectly sealed cleaning covers this air may lead to incomplete combustion in the fire trough and thus piling up of pellets DANGER of FIRE To ensure the proper operation of your...

Page 20: ...CLEANING and MAINTENANCE Problem 2 Stove smells strongly and smokes outside Cause s Q Q Burning in phase taking into service Q Q Stove has accumulated dust and or dirt Possible solutions Q Q Wait to e...

Page 21: ...s These are the basic stove functions that are to be checked and ticked off The stove is ready for operation if these functions are ensured Operator instruction This is one of the most important point...

Page 22: ...aged Serial number Operating instructions Software version Warranty documents Touchdisplay version Door opener Electrical periphery Connection socket earthed GSM modem present Room thermostat present...

Page 23: ...nuals valid at the time of purchase Connection must be performed by a specialist for such stoves Any costs incurred by the manufacturer due to unjustified warranty claims are to be charged to the clai...

Page 24: ...one Technical and design changes as well as typesetting and printing errors reserved 2019 RIKA Innovative Ofentechnik GmbH Z38152_REVO II_RAO_PGI_EN 16 09 2019 RIKA Innovative Ofentechnik GmbH M ller...

Reviews: