5.13.2 Gas train
Approved according to standard EN 676 and provided separately
from the burner.
To select the correct gas train model, refer to the supplied "Burn-
er-gas train combination" manual.
5.13.3 Gas train installation
The gas train is to be connected on the right of the burner, by
flange 1) (Fig. 30).
5.13.4 Gas pressure
Tab. H indicates the pressure drop of the combustion head and
the gas butterfly valve depending on the operating output of the
burner.
Tab. H
The values shown in Tab. H refer to:
–
Natural gas G 20 NCV 9.45 kWh/Sm
3
(8.2 Mcal/Sm
3
)
–
Natural gas G 25 NCV 8.13 kWh/Sm
3
(7.0 Mcal/Sm
3
)
Column 1
Combustion head pressure drop.
Gas pressure measured at test point P1)(Fig. 31), with:
•
combustion chamber at 0 mbar;
•
burner working at maximum modulating output;
•
combustion head set as on page 20.
Column 2
Pressure loss at gas butterfly valve P2)(Fig. 31) with maximum
opening: 90°.
To calculate the approximate output at which the burner oper-
ates:
–
subtract the combustion chamber pressure from the gas
pressure measured at test point P1)(Fig. 31).
–
Find, in Tab. H related to the burner concerned, the pressure
value closest to the result of the subtraction.
–
Read off the corresponding output on the left.
Example with natural gas G20:
Operation at maximum modulating output
Gas pressure at test point P1)(Fig. 31)
=
32.8 mbar
Pressure in combustion chamber
=
5 mbar
32.8 - 5
=
27.8 mbar
A pressure of 27.8 mbar, column 1, corresponds in Tab. H to an
output of 6000 kW.
This value serves as a rough guide; the effective output must be
measured at the gas meter.
To calculate the required gas pressure at test point P1)(Fig. 31),
set the maximum modulating output required from the burner op-
eration:
–
find the nearest output value in Tab. H for the burner in ques-
tion.
–
Read, on the right (column 1), the pressure at the test point
P1) (Fig. 31).
–
Add this value to the estimated pressure in the combustion
chamber.
DANGER
Disconnect the electrical power using the main
switch.
Check that there are no gas leaks.
Pay attention when handling the train: danger of
crushing of limbs.
Make sure that the gas train is properly installed
by checking for any fuel leaks.
The operator must use the required equipment
during installation.
Fig. 30
P1
P4
D3095
kW
1
p (mbar)
2
p (mbar)
G 20
G 25
G 20
G 25
3000
7,2
11,1
2,5
3,7
3500
10,1
15,8
3,5
5,1
4000
13,0
20,5
4,5
6,6
4500
15,8
25,2
5,7
8,4
5000
19,5
30,6
7,0
10,3
5500
23,6
36,5
8,5
12,5
6000
27,8
42,3
10,1
14,9
6500
32,0
48,1
11,9
17,5
6650
33,2
49,9
12,5
18,3
Summary of Contents for RLS 650/E MX
Page 2: ...Translation of the original instructions ...
Page 44: ...20027766 42 GB Appendix Electrical panel layout ...
Page 45: ...43 20027766 GB Appendix Electrical panel layout ...
Page 47: ...45 20027766 GB Appendix Electrical panel layout ...
Page 48: ...20027766 46 GB Appendix Electrical panel layout 0 1 1 1 ...
Page 49: ...47 20027766 GB Appendix Electrical panel layout 0 ...
Page 50: ...20027766 48 GB Appendix Electrical panel layout 0 0 0 1 0 2 0 0 0 0 0 0 0 30 3 3 0 0 1 0 ...