
20144819
14
GB
Installation
5.4
Operating position
5.5
Preparing the boiler
5.5.1
Boring the boiler plate
Pierce the closing plate of the combustion chamber, as in Fig. 8.
The position of the threaded holes can be marked using the ther-
mal insulation screen supplied with the burner.
Tab. D
5.5.2
Blast tube length
The length of the blast tube must be selected according to the in-
dications provided by the manufacturer of the boiler, and in any
case it must be greater than the thickness of the boiler door com-
plete with its fettling. The range of lengths available, L, is as fol-
lows:
Tab. E
For boilers with a front flue gas wash 9)(Fig. 9) or flame inversion
chamber, a protection device in refractory material 7) must be in-
serted between the boiler refractory 8) and the blast tube 6).
This protective fettling must not compromise the extraction of the
blast tube.
WARNING
The burner is set up only to operate in posi-
tions
1, 2, 3
and
4
Installation
1
is preferable, as it is the only
one that allows the maintenance operations
as described in this manual.
Installations
2, 3
and
4
permit operation but
make maintenance and inspection of the
combustion head more difficult.
DANGER
Any other position could compromise the cor-
rect operation of the appliance.
Installation
5
is prohibited for safety reasons.
Fig. 7
2
3
4
5
1
D7739
mm
A
B
C
D
GAS 3
155
160
160
M10
GAS 4
165
160
160
M10
GAS 5
165
160
160
M10
GAS 6
185
195
195
M12
Fig. 8
D46
Blast tube
L mm
GAS 3
GAS 4
GAS 5
GAS 6
Shortened
43
45
65
85
Standard
185
187
207
227
Elongated
320
320
365
360
Summary of Contents for GAS 3
Page 2: ...Translation of the original instructions...
Page 37: ...35 20144819 GB Appendix Electrical panel layout GAS 3 4 SINGLE PHASE D2855 DIAGRAM A...
Page 38: ...20144819 36 GB Appendix Electrical panel layout GAS 5 6 THREE PHASE D2861 DIAGRAM A...
Page 39: ...37 20144819 GB Appendix Electrical panel layout 20144739 GAS 3 4 SINGLE PHASE DIAGRAM B...
Page 40: ...20144819 38 GB Appendix Electrical panel layout DIAGRAM B GAS 5 6 THREE PHASE 20144741...
Page 41: ...39 20144819 GB Appendix Electrical panel layout GAS 3 4 SINGLE PHASE DIAGRAM C 20144742...
Page 42: ...20144819 40 GB Appendix Electrical panel layout DIAGRAM C GAS 5 6 THREE PHASE 20144743...