83
ENGLISH
−
Do not install the unit in places often used as a work space.
In case of construction work (e.g. grinding etc.) where a lot of
dust is created, the unit must be covered.
−
Do not place any object or equipment on top of the unit (top plate).
−
Do not climb, sit or stand on top of the unit.
−
Be sure that sufficient precautions are taken in case of refrige
-
rant leakage according to relevant local laws and regulations.
−
Don’t install the unit near the sea or where there is corrosion
gas.
When installing the unit in a place exposed to strong wind, pay
special attention to the following.
Strong winds of 5 m/sec or more blowing against the unit's air
outlet causes a short circuit (suction of discharge air), and this
may have the following consequences:
−
Deterioration of the operational capacity.
−
Frequent frost acceleration in heating operation.
−
Disruption of operation due to rise of high pressure.
−
When a strong wind blows continuously on the front of the
unit, the fan can start rotating very fast until it breaks. In nor-
mal condition,refer to the figures below for installation of the
unit:
A
Unit
A(mm)
4~6kW
≥300
8~16kW
≥300
In case of strong wind and the wind direction can be foreseen,refer to
the figures below for installation of the unit(any one is OK):
Turn the air outlet side toward the building's wall, fence or screen.
B
Unit
B(mm)
4~6kW
≥1000
8~16kW
≥1500
Make sure there is enough room to do the installation.
Set the outlet side at a right angle to the direction of the wind.
Prepare a water drainage channel around the foundation, to
drain waste water from around the unit.
If water does not easily drain from the unit, mount the unit on a
foundation of concrete blocks, etc. (the height of the foundation
should be about 100 mm.
If you install the unit on a frame, please install a waterproof plate
(about 100 mm) on the underside of the unit to prevent water
from coming in from the low side.
When installing the unit in a place frequently exposed to snow,
pay special attention to elevate the foundation as high as pos-
sible.
6.1 Selecting a location in cold climates
Refer to "Handling" in section “4 Before installation”
NOTE
When operating the unit in cold climates, be sure to follow the in-
structions described below.
To prevent exposure to wind, install the unit with its suction side
facing the wall.
Never install the unit at a site where the suction side may be
exposed directly to wind.
To prevent exposure to wind, install a baffle plate on the air di
-
scharge side of the unit.
In heavy snowfall areas, it is very important to select an installa-
tion site where the snow will not affect the unit. If lateral snowfall
is possible, make sure that the heat exchanger coil is not af-
fected by the snow (if necessary construct a lateral canopy).
①
②
1 Construct a large canopy.
2
Construct a pedestal.
Install the unit high enough off the ground to prevent it from being
buried in snow.
6.2 Selecting a location in hot climates
As the outdoor temperature is measured via the outdoor unit air ther-
mistor, make sure to install the outdoor unit in the shade or a canopy
should be constructed to avoild direct sunlight, so that it is not influen
-
ced by the sun’s heat, otherwise protection may be possible to the unit.
If you install the unit on a building frame, please in-
stall a waterproof tray (field supply) (about 100mm,
on the underside of the unit) in order to avoid drain
water dripping. (See the picture in the right).
Summary of Contents for 20191845
Page 72: ...74 ITALIANO ...