8
1.7
Installation of the boiler
The dimensions of the boiler room and the free spaces should
make it easy to carry out any assembly work, repairs, re-assem-
bly and connection of the burner.
900 mm
A + 200
(min.
1000 mm)
A + 200
(min.
1000 mm)
The recommended height for the boiler room is at least 2,200
mm, leave the minimum space free on the sides and in front of
the boiler as shown in the drawing. Provide a base with a min-
imum height of 200 mm above the floor for the installation of
the burner of the boiler.
MODEL
LENGTH L (mm)
RTT 378
1,300
RTT 448
1,460
RTT 506
1,620
RTT 564
1,780
RTT 610
1,940
RTT 663
2,100
RTT 715
2,260
RTT 773
2,420
RTT 831
2,580
RTT 878
2,740
RTT 930
2,900
1000 mm
200 mm
L -200 mm
L
A
Characteristics of the base:
− The concrete base should have the indicated dimensions.
− The concrete base should not be covered with a slippery
material like ceramic etc.
− Any acoustic insulation should be made before the base.
− The base should be made of BS 25 fiber concrete.
0
Do not place flammable materials on the boiler or at a dis-
tance less than the specified safety distance.In the RTT boil-
ers the door of the burner can open from both sides. For
this reason, equal free distances are specified on both sides
(min. 700 mm). This characteristic is advantageous for oper-
ations to be carried out on the boiler. If the space available
in the boiler room is not sufficient for the distances indicat-
ed, you can choose the opening side and leave more space
free on that part. On the other part, half the indicated free
distance is sufficient.
Provide enough space for the tools to be used in the boiler room.