6
Vac Assembly
1. Line up vacuum port in top assembly
with drain cap located on the front of
the drum.
2. Place lid on top of drum with the han-
dles snug against the drum channel.
3. Be sure lid completely covers the top of
the drum so leakage does not occur.
4. Push down on top of the locking tab
areas to cause the flexible locking tabs
to hook onto the drum lip of the chan-
nel.
5. Make sure that the locking tabs are
snapped in place to prevent the lid from
coming off. (See inset)
6. Rotate both drum latches down until
you hear them snap over lip of the
drum.
Your new wet/dry vac is ready for use.
Cord Storage
Simply, wrap the power cord around the
power head and snap the connector on
the plug to a wrap of the cord..
Cord Wrap
Area
Dust
Hose
Caster Feet
w/Accessory
Storage
Drum
Pull
Casters
Power
Cord
Drain Cap
Blower
Port
On-Off Switch
Handle
Top Assembly
Push
Down
Pull Out
Drum
Latch
Tab
Drum
Channel
Drum
Drum
Latch
Out
Summary of Contents for WD20620
Page 11: ...11 Notes ...
Page 14: ...14 Notes ...
Page 15: ...15 Notes ...
Page 27: ...27 Notas ...
Page 30: ...30 Notas ...
Page 31: ...31 Notas ...
Page 43: ...43 Remarques ...
Page 46: ...46 Remarques ...
Page 47: ...47 Remarques ...