background image

Span 400 Instruction Manual

DESIGNATION
SPAN 400  Double Width

 

EN 1004 – 3 — 8/12 — XXCD

 

SPAN 400  Single Width

 

EN 1004 — 3 — 8/8 — XXCD

CEN designation of this instruction manual

 

EN 1298 — IM — en

Rev-0

1

Summary of Contents for Span 400

Page 1: ...Span 400 Instruction Manual DESIGNATION SPAN 400 Double Width EN 1004 3 8 12 XXCD SPAN 400 Single Width EN 1004 3 8 8 XXCD CEN designation of this instruction manual EN 1298 IM en Rev 01 ...

Page 2: ...ny part of the tower 3 Locking down the platform Windlock A windlock clip is installed on the platform at the hook This is locked as shown here SAFE WORKING LOADS AND WORKING HEIGHTS The safe working load at each level of platform is 360kg evenly distributed regardless of whether one or two platforms are installed Therefore even if two platforms are installed side by side total cumulative load sha...

Page 3: ...ght at 4m height intervals Ensure that couplers are suitable for 50mm diameter aluminum tube Do not use boxes or steps to gain additional height If extra height required contact your distributor to get extra components Do not lift or suspend an assembled mobile tower Damaged components or components from other tower systems must never be used Stabilisers should always be fitted when specified Use th...

Page 4: ...ty is maintained insert any extended adjustable legs completely into the frame Release the castor brakes Carefully move the tower by manually applying force at the base Do not use mechanical means to move the tower Once positioned prepare the tower for use Check and adjust as necessary to ensure all castors and stabilisers are in firm contact with the ground Check that the tower is vertical using a...

Page 5: ...ds are approximately equidistant from each other as shown in Fig 2 Adjust the outrigger and reposition the clamps as required to make firm contact with the ground Ensure the clips with locking pin are in place When in the correct position tighten the clamps firmly To position the tower against a wall do not remove the stabiliser move parallel with the wall Fig 3 To position the tower in a corner rem...

Page 6: ...th build table should be increased to match the number of trapdoor platforms Fig 6 Fig 7 3m 5m 7m 9m 11m height builds When building to an odd working platform height the 3 rung frames should be omitted a platform can be temporarily positioned on the second rung with platforms then positioned at rung 7 3m rung 12 5m rung 17 7m Other details of the build remain unchanged ...

Page 7: ...tion Weight kg 5 Rung Frame 9 3 1 3 Rung Frame 5 8 Trapdoor Platform 2m 2 5m 3m 14 18 20 1 2 3 4 5 6 Fixed Platform 2m 2 5m 3m 14 17 20 1 1 1 1 1 1 Horizontal Brace 2m 2 5m 3m 1 7 2 2 4 3 5 9 13 17 21 Diagonal Brace 2m 2 5m 3m 1 8 2 2 2 5 4 8 12 16 20 24 Guard rail bracing frame 2m 2 5m 3m 3 8 4 4 5 2 2 2 2 2 2 2 Telescopic Stabiliser 5 2 4 4 4 Large Stabiliser 6 8 4 4 4 Adjustable Leg 1 1 4 4 4 4...

Page 8: ...05 DOUBLE WIDTH TOWER 6m 1 3 5 2 4 6 7 8 ...

Page 9: ...08 9 11 10 12 DOUBLE WIDTH TOWER 6m 13 14 15 16 ...

Page 10: ...09 17 19 18 DOUBLE WIDTH TOWER 6m ...

Page 11: ...10 DOUBLE WIDTH TOWER 5m 1 3 5 2 4 6 7 8 ...

Page 12: ...11 9 11 10 12 DOUBLE WIDTH TOWER 5m 13 14 15 16 ...

Page 13: ...12 17 18 DOUBLE WIDTH TOWER 5m ...

Page 14: ...eights included 150mm 6 inches leg adjustment for leveling that can be increased or reduced Description Weight kg 5 Rung Frame 7 3 1 2 3 3 Rung rame 5 1 1 1 1 Trapdoor latform 2m 2 5m 3m 1 1 20 ori ontal race 2m 2 5m 3m 1 7 2 2 1 5 13 iagonal race 2m 2 5m 3m 1 2 2 2 5 uard rail bracing frame 2m 2 5m 3m 3 5 2 2 2 2 2 Telescopic tabiliser 5 2 arge tabiliser 6 d ustable eg 1 1 astor aseplate 2 Toe bo...

Page 15: ...14 SINGLE WIDTH TOWER 6m 1 3 5 2 4 6 7 8 ...

Page 16: ...15 9 11 10 12 SINGLE WIDTH TOWER 6m 13 14 15 16 ...

Page 17: ...16 17 18 SINGLE WIDTH TOWER 6m ...

Reviews: