MOVING TOWERS
To Move the tower to a new position, first prepare the tower.
•
Check that the wind speed does not exceed 29km/h (8.1m/s).
•
Ensure the tower is empty (material and personnel).
•
Check for overhead obstructions including electrical cables.
•
Raise the stabiliser feet (only enough to clear obstructions).
•
Taking care to ensure tower stability is maintained, insert any extended adjustable legs completely into
the frame.
•
Release the castor brakes.
•
Carefully move the tower by manually applying force at the base. Do not use mechanical means to move
the tower.
•
Once positioned prepare the tower for use.
•
Check and adjust as necessary to ensure all castors and stabilisers are in firm contact with the ground.
•
Check that the tower is vertical using a spirit level.
•
Reapply the castor brakes.
EXPLODED VIEW
Span 400 - double width
Span 400 - single width
01
02
03
04
05
3
06
0
5
5
08
09
10
11
12
Summary of Contents for Span 400
Page 8: ...05 DOUBLE WIDTH TOWER 6m 1 3 5 2 4 6 7 8 ...
Page 9: ...08 9 11 10 12 DOUBLE WIDTH TOWER 6m 13 14 15 16 ...
Page 10: ...09 17 19 18 DOUBLE WIDTH TOWER 6m ...
Page 11: ...10 DOUBLE WIDTH TOWER 5m 1 3 5 2 4 6 7 8 ...
Page 12: ...11 9 11 10 12 DOUBLE WIDTH TOWER 5m 13 14 15 16 ...
Page 13: ...12 17 18 DOUBLE WIDTH TOWER 5m ...
Page 15: ...14 SINGLE WIDTH TOWER 6m 1 3 5 2 4 6 7 8 ...
Page 16: ...15 9 11 10 12 SINGLE WIDTH TOWER 6m 13 14 15 16 ...