32DF9T02.C
4 - 6
6)
Refer to
Figure 4-6
. Loosen jam-nut and adjust the link length by turning the center sec-
tion. Adjust link so that rollstop closes to within 1/32" of rubber bumper (that rollstop con-
tacts). Rotating the center section counterclockwise (viewed from rollstop) shortens the
link, and turning it clockwise lengthens it.
7)
Re-install right rollstop cover and manual
rollstop control knob.
8)
Reconnect positive battery cable at vehicle
battery compartment.
d.
Rollstop “Closed” Switch Adjustment
NOTE:
Refer to Electrical Controls section if re-
placement of rollstop “Closed” switch is
necessary.
1)
Deploy platform using control pendant
( /OUT), and then support.
WARNING!
•• WEAR PROTECTIVE CLOTHING AND EYE PROTECTION AT ALL TIMES.
BATTERIES CONTAIN ACID THAT CAN BURN. IF ACID COMES INTO CON-
TACT WITH SKIN, IMMEDIATELY FLUSH AFFECTED AREA WITH WATER AND
WASH WITH SOAP.
•• WORK IN A PROPERLY VENTILATED AREA. DO NOT SMOKE OR USE AN
OPEN FLAME IN THE VICINITY OF BATTERY.
••
• •
DO NOT LAY ANYTHING METALLIC ON TOP OF BATTERY.
2)
Disconnect positive battery cable at vehicle battery compartment.
3)
Remove left rollstop cover (four screws and washers).
4)
Remove left rollstop release bracket.
5)
Have an assistant hold rollstop actuator foot up (
Figure 4-5
). Open rollstop with rollstop
manual control knob (other hand assisting rollstop).
6)
Refer to
Figure 4-7
. Adjust “Closed”
switch by loosening jam-nut and turning
adjustment screw that protrudes from
end of plunger. The enlarged view
shows plunger position when rollstop is
open. The plunger should move to posi-
tion shown in upper view when rollstop
is closed. Adjust screw so that switch
roller is on outside diameter of plunger
when rollstop is closed. Retighten jam-
nut.
NOTE:
The plunger may need to be held with a
small pair of pliers to turn screw. Do not
scratch outside surface of plunger with
pliers; this could cause plunger to seize
in its bore.
7)
Close rollstop.
8)
Re-install left rollstop cover and left roll-
stop release bracket.
9)
Reconnect positive battery cable at ve-
hicle battery compartment.
FIGURE 4-6: CLOSED ROLLSTOP ADJUSTMENT
CENTER SECTION
JAM NUT
1/32"
FIGURE 4-7: “CLOSED” SWITCH ADJUSTMENT
JAM NUT
PLUNGER
ADJUSTMENT
ROLLSTOP "CLOSED"
SWITCH
SCREW
LOCK WASHER
Summary of Contents for Mirage F9T
Page 32: ...32DF9T02 B 3 9 D HYDRAULIC SYSTEM DIAGRAM FIGURE 3 1 F9T HYDRAULIC SYSTEM ...
Page 35: ...32DF9T02 B 3 12 FIGURE 3 2 F9T DEDICATED ENTRY ELECTRICAL DIAGRAM SHEET 1 ...
Page 36: ...32DF9T02 B 3 13 FIGURE 3 3 F9T DEDICATED ENTRY ELECTRICAL DIAGRAM SHEET 2 ...
Page 37: ...32DF9T02 B 3 14 FIGURE 3 4 F9T STEPWELL ELECTRICAL DIAGRAM SHEET 1 ...
Page 38: ...32DF9T02 B 3 15 FIGURE 3 5 F9T STEPWELL ELECTRICAL DIAGRAM SHEET 2 ...
Page 71: ...32DF9T02 C 5 2 FIGURE 5 1 STEPWELL MODEL DECALS LOCATIONS AND PART NUMBERS ...
Page 72: ...32DF9T02 C 5 3 FIGURE 5 2 F9T DEDICATED ENTRY MODEL DECALS LOCATIONS AND PART NUMBERS ...
Page 73: ...32DF9T02 C 5 4 FIGURE 5 3 F9T PUMP BOX ASSEMBLY ...
Page 75: ...32DF9T02 C 5 6 FIGURE 5 4 F9T LIFTING FRAME ASSEMBLY ...
Page 77: ...32DF9T02 C 5 8 FIGURE 5 10 F9T ENCLOSURE ASSEMBLY TOP BOTTOM ...
Page 79: ...32DF9T02 C 5 10 FIGURE 5 6 F9T PLATFORM ASSEMBLY DEDICATED ENTRY ...
Page 81: ...32DF9T02 C 5 12 FIGURE 5 7 F9T PLATFORM ASSEMBLY STEPWELL ...
Page 83: ...32DF9T02 C 5 14 FIGURE 5 8 F9T PLATFORM ASSEMBLY LEFT SIDE DETAIL ...
Page 85: ...32DF9T02 C 5 16 FIGURE 5 9 F9T PLATFORM ASSEMBLY RIGHT SIDE DETAIL ...
Page 87: ...32DF9T02 C 5 18 FIGURE 5 10 F9T BRIDGEPLATE ASSEMBLY DEDICATED ENTRY ...
Page 89: ...32DF9T02 C 5 20 FIGURE 5 11 F9T BRIDGEPLATE ASSEMBLY STEPWELL ...
Page 91: ...32DF9T02 C 5 22 FIGURE 5 12 F9T CARRIAGE ASSEMBLY SHEET 1 ...
Page 92: ...32DF9T02 C 5 23 FIGURE 5 13 F9T CARRIAGE ASSEMBLY SHEET 2 ...
Page 94: ...32DF9T02 C 5 25 This page intentionally left blank ...
Page 95: ...32DF9T02 C 5 26 FIGURE 5 14 F9T PENDANT ASSEMBLY ...