99
PE-MF3/PE-P2 Training
Slide 99
After you Replace the Laser Optics Housing Unit (1)
Important: First, open the front cover and turn on the
machine.
Do the following 2 steps with the front cover of the machine
open.
On the LCD, access “LSU Adjustment” inside the “Engine
Maintenance” menu.
Manually input the corresponding LSU data from your
supervisor into the space provided on the LCD.
Close the front cover.
Execute "Color Registration" in the "Engine Maintenance"
menu.
Turn the main switch off/on.
MUSIC will be performed automatically.
No additional notes