A-12
1
Getting Started
Guide to Components
EBA002
1.
Power switch
See page A-17 “Color Controller Startup,
Shutdown, and Restart”.
2.
Front side USB port
Port for installing system software, acti-
vating Fiery features, or printing from a
prepared USB flash drive.
3.
Power indicator
When Color Controller is operating, the
LED is lit.
4.
HDD access indicator
While Color Controller HDD is being ac-
cessed, the indicator flashes.
5.
Back side USB ports
Ports for installing system software, acti-
vating Fiery features, or printing from a
prepared USB flash drive.
6.
Not used (monitor port)
7.
Network connector 10/100/1000Mbps
A port for connecting Color Controller to
a LAN.
8.
Network connector 10/100/1000Mbps
A port for connecting Color Controller to
the main unit.
9.
Power connector
10.
Main power switch
See page A-17 “Color Controller Startup,
Shutdown, and Restart”.
11.
Service switches (for service use
only)
12.
LEDs (2-digit diagnostic display)
Summary of Contents for E-25C
Page 2: ......
Page 4: ...A ii ...
Page 20: ...A 16 1 Getting Started ...
Page 24: ...A 20 MEMO ...
Page 25: ... 2018 ...
Page 26: ...EN GB EN US EN AU D3GF 6753 ...