D392 Ring Binder Training
16
Slide 16
Paper Path
Ring Binding - 4
The binding unit
swings to the left to
catch the stack.
The stack feeds
forward a short
distance, so that the
leading edge enters
the top of the binder
unit.
In the binding unit, the
clamp unit takes one
ring from the cartridge
and clamps it through
the punched holes in
the stack.
Then the clamp unit
moves back to the
vertical position.
Clamp Unit
Ring
Cartridge
D392 service manual, Details, Overview, Paper Transport
Now the paper is fed into the ring binder.
The red arrow indicates the movement of the clamp unit in the binder unit.
Summary of Contents for D392
Page 2: ...D392 Ring Binder Training 2 Slide 2 Overview No additional notes ...
Page 10: ...D392 Ring Binder Training 10 Slide 10 Machine Component Overview No additional notes ...
Page 18: ...D392 Ring Binder Training 18 Slide 18 Paper Feed and Switchback No additional notes ...
Page 23: ...D392 Ring Binder Training 23 Slide 23 Punching Holes in the Paper No additional notes ...
Page 31: ...D392 Ring Binder Training 31 Slide 31 Binder Unit Overview No additional notes ...
Page 43: ...D392 Ring Binder Training 43 Slide 43 Binder Unit Pre bind Jogger Unit No additional notes ...
Page 49: ...D392 Ring Binder Training 49 Slide 49 Pre bind Jogger Jogger Fence Motor No additional notes ...
Page 59: ...D392 Ring Binder Training 59 Slide 59 Binder Unit Ring Binding No additional notes ...
Page 64: ...D392 Ring Binder Training 64 Slide 64 Output and Stacking No additional notes ...