MT-C4 Training
52
Slide 52
Circuit Boards
The procedures have all changed.
Also note the following points
NVRAM
The BCU and controller boards both have NVRAMs.
See the service manual for correct removal and
replacement procedures.
CNT Board
Each model in this series has a different CNT board.
If you install the wrong CNT board, the operation panel
displays SC955-03.
In this case, replace the CNT with the correct board.
Remove the NVRAM from the old CNT board, and install it
on the new CNT board.
No additional notes
Summary of Contents for D062
Page 2: ...MT C4 Training 2 Slide 2 PRODUCT OUTLINE Introduction No additional notes...
Page 6: ...MT C4 Training 6 Slide 6 Appearance A4 LCT Booklet Finisher Mailbox Folder No additional notes...
Page 8: ...MT C4 Training 8 Slide 8 PRODUCT OUTLINE Sales Points No additional notes...
Page 11: ...MT C4 Training 11 Slide 11 Easy Pull out Tray Handles No additional notes...
Page 14: ...MT C4 Training 14 Slide 14 Product Positioning No additional notes...
Page 15: ...MT C4 Training 15 Slide 15 PRODUCT OUTLINE Options No additional notes...
Page 26: ...MT C4 Training 26 Slide 26 Fax Options Fax unit New G3 interface unit New No additional notes...
Page 34: ...MT C4 Training 34 Slide 34 PRODUCT OUTLINE Targets No additional notes...
Page 40: ...MT C4 Training 40 Slide 40 MAINTENANCE This section describes changes to PM since the MT C3 5...