MT-C4 Training
38
Slide 38
Changes
Main machine
The following procedures are modified slightly
Developer initialization
» See the next slide
Leveling the machine
» See the service manual for the new procedure
Procedures were added for connecting the following
» Drum heater
» Tray heater
» Scanner heater
Options
A3/DLT Feeder Kit (D482) installation is changed, because
there are some modifications to the tandem tray.
Copy connector kit installation procedure: Based on V-C2
New procedures for the new options (folder, USB/SD slot)
» Folder installation: There are two paper guides in the
accessories. Use the short paper guide; the long one is for
use with the B-C4
Changed procedures for the controller options
» Check the service manual for the new procedures
No additional notes
Summary of Contents for D062
Page 2: ...MT C4 Training 2 Slide 2 PRODUCT OUTLINE Introduction No additional notes...
Page 6: ...MT C4 Training 6 Slide 6 Appearance A4 LCT Booklet Finisher Mailbox Folder No additional notes...
Page 8: ...MT C4 Training 8 Slide 8 PRODUCT OUTLINE Sales Points No additional notes...
Page 11: ...MT C4 Training 11 Slide 11 Easy Pull out Tray Handles No additional notes...
Page 14: ...MT C4 Training 14 Slide 14 Product Positioning No additional notes...
Page 15: ...MT C4 Training 15 Slide 15 PRODUCT OUTLINE Options No additional notes...
Page 26: ...MT C4 Training 26 Slide 26 Fax Options Fax unit New G3 interface unit New No additional notes...
Page 34: ...MT C4 Training 34 Slide 34 PRODUCT OUTLINE Targets No additional notes...
Page 40: ...MT C4 Training 40 Slide 40 MAINTENANCE This section describes changes to PM since the MT C3 5...