RMST SYSTEM VERIFICATION TABLE
PHASE
DESCRIPTION
VERIFICATION
1
Implementation of the serial network between unit serial boards (for Z-Power and Z-Flow units only with MASTER
board) and sequencer serial board (port identified as “FIELD CARD”), following that indicated at page 39 "Instal-
lation of the serial board" and page 42 "System structure".
2
Installation of the hydraulic circuit (collectors) of the water temperature probes (system flow and return) and elec-
trical connection to the sequencer panel, following that indicated in Attachment A2 at page 86 "Electrical wiring".
3
Serial communication setting on the chiller unit (serial address, communication protocol and transmission speed),
following that indicated at page 40 "Setting the chiller unit serial network".
4
Sequencer configuration, specifically:
•
Enabling and configuring analog inputs (page 29)
•
Enabling and configuring digital inputs (page 29)
•
Setting the system (number of units, rotation type, chiller type) (ref. page 28)
•
Setting the adjustment mode (set-point and adjustment type) (page 30)
5
Activating the system (page 29)
6
After programming, the system must be electrically disconnected and re-energised to enable the settings.
7
Check the network state following that indicated at page 26-27 "Displaying the system serial network state" and
at page 30 (parameters and sizes of the network units).