OPERATION
RC12 12/05
Operation Section 4-35
© 2005 Alamo Group Inc.
OPERA
T
ION
13.2 Hauling the Tractor and Implement
Before transporting a loaded tractor and implement,
measure the height and width dimensions and gross
weight of the complete loaded unit. Ensure that the
load will be in compliance with the legal limits set for
the areas that will be traveled through.
OPS-U- 0024
Use adequately sized and rated trailers and
equipment to transport the tractor and implement.
Consult an authorized dealer to determine the proper
equipment required. Using adequately sized chains,
heavy duty straps, cables and/or binders, securely tie
down both the front and rear of the tractor utilizing the
proper tie down locations as specified by the tractor
manufacturer.
OPS-U- 0025
Arrange the chains so that when tightened, the
chains are pulling downward and against
themselves. Carefully tighten the securing chains or
other fasteners used as much as possible using
boomers or binders to apply maximum tension. Use
extreme care when attaching and removing the
securing devices as the extreme tension involved
when released has the potential to inflict serious
injury.
While hauling the tractor and implement, make
occasional stops to check that the tractor and
implement have not moved or shifted and that the
securing chains have maintained tension. If during transport a hard braking, sharp turning, or swerving action
was performed, stop at the next safe location to inspect the security of the load.
OPS-U- 0026
Summary of Contents for RC-12
Page 5: ...Safety Section 1 1 2005 Alamo Group Inc SAFETY SECTION ...
Page 31: ...Introduction Section 2 1 2005 Alamo Group Inc INTRODUCTION SECTION ...
Page 36: ......
Page 37: ...Assembly Section 3 1 2005 Alamo Group Inc ASSEMBLY SECTION ...
Page 43: ...Operation Section 4 1 2005 Alamo Group Inc OPERATION SECTION ...
Page 80: ......