![RHINO LUMBERJACK 60 Operator'S Manual Download Page 89](http://html1.mh-extra.com/html/rhino/lumberjack-60/lumberjack-60_operators-manual_1452548089.webp)
OPERATION
LJ60/72 02-02 Operation Section 4-15
OPERA
TION
© 2004 Alamo Group Inc.
Refer to the tractor operator’s manual to ensure a
complete pre-operation inspection and scheduled
service is performed according to manufacturer
recommendations. The following is a partial list of
items requiring inspection:
"
Tire condition/air pressure
"
Wheel lug bolts
"
Steering linkage
"
PTO shield
"
SMV sign is clean and visible
"
Tractor’s lights are clean and functional
"
Tractor Seat belt is in good condition
"
Tractor cab or ROPS is in good condition
"
ROPS is in the raised position
"
No tractor oil leaks
"
Radiator free of debris
"
Engine oil level and condition
"
Engine coolant level and condition
"
Power brake fluid level
"
Power steering fluid level
"
Fuel condition and level
"
Sufficient lubrication at all lube points
"
Air filter condition
8.1 Tractor Pre-Operation Inspection/Service
8.2 Cutter Pre-Operation Inspection/Service
Before each cutter use, a complete inspection and service is required to ensure the cutter is in a good and safe
working condition. Damaged and/or broken parts should be repaired and/or replaced immediately. To ensure the
cutter is ready for operation, conduct the following
.
"
Perform scheduled lubrication as detailed in the
maintenance section.
"
Ensure all decals are in place and legible.
"
Ensure driveline is securely attached to tractor.
Make sure the driveline yoke clamping cone is
securely seated in the grooves of the PTO shaft
and tightened.
"
Inspect that the 3-point hitch pins are the proper
size, correctly installed, and secured to the tractor
lift arms with retaining pins inserted.
Summary of Contents for LUMBERJACK 60
Page 6: ......
Page 7: ...SAFETY SECTION Safety Section 1 1...
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ...INTRODUCTION SECTION Introduction Section 2 1...
Page 68: ......
Page 69: ...ASSEMBLY SECTION Assembly Section 3 1...
Page 74: ......
Page 75: ...OPERATION SECTION Operation Section 4 1...
Page 111: ...MAINTENANCE SECTION Maintenance Section 5 1...
Page 124: ......
Page 126: ...LJ60 72 SOM 02 02 P N 00772058C Printed U S A TREE CUTTER LUMBERJACK 60 72...
Page 129: ......
Page 131: ......