OPERATION
2407TL 01/11
Operation Section 4-7
© 2011 Alamo Group Inc.
OPERA
T
ION
Tractor Requirements and Capabilities
•
ASABE approved Roll-Over Protective Structure (ROPS) or ROPS cab and seat belt
•
Tractor Safety Devices .................Slow Moving Vehicle (SMV) emblem, lighting
•
Tractor Ballast......................As required to maintain 25% of gross weight of tractor, loader and
bucket load on rear tires
3.3 Tractor Ballast
Before operating tractor and loader, add sufficient counterweight so a minimum of 25% of the
total weight is on the rear axle. Total weight includes weight of: tractor, loader, rated load in
bucket, and counterweight. Rated load is lift capacity at full height at 500mm forward of
bucket pivot point. (See Standard Equipment and Specifications). When determining
required counterweight bucket should be at maximum forward position (bucket pivot point at
the same height as boom pivot point on mast).
3.1 ROPS and Seat Belt
The tractor must be equipped with a Roll-Over-Protective-Structure (ROPS) (tractor cab or roll-bar) and seat
belt to protect the operator from falling off the tractor, especially during a roll over where the driver could be
crushed and killed. Only operate the tractor with the ROPS in the raised position and seat belt fastened.
Tractor models not equipped with a ROPS and seat belt should have these life saving features installed by an
authorized dealer.
OPS-U- 0003
3.2 Tractor Lighting and SMV Emblem
If the tractor will be operated near or traveled on a
public roadway it must be equipped with proper
warning lighting and a Slow Moving Vehicle (SMV)
emblem which are clearly visible from the rear of
the unit. Most tractor’s have different settings for
operating and transporting lighting. Refer to the
tractor operator’s manual for using the tractor’s
light switch and operating the turn signals.
OPS-B- 0017
Summary of Contents for 2407TL
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 27: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 32: ......
Page 33: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION...
Page 40: ......
Page 41: ...Operation Section 4 1 OPERATION SECTION...
Page 84: ......
Page 85: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Page 95: ...MAINTENANCE 2407TL 01 11 Maintenance Section 5 11 2011 Alamo Group Inc MAINTENANCE...
Page 96: ...MAINTENANCE 2407TL 01 11 Maintenance Section 5 12 2011 Alamo Group Inc MAINTENANCE...
Page 97: ......
Page 100: ...2407TL SOM 01 11 P N F 4003C Printed U S A 2407TL LOADER...