background image

                                  

Assembly Instructions Greenhouse

 

Round Style 12 x 24 x 8  

 

 

 

V1 

Please Do NOT Return Assembly to Dealer or Store. For All questions or Shortages please call MDM Products directly 

Customer Service 800-447-7079 or 203-877-7070 

10

 
 
 

CUSTOMER SERVICE & ASSISTANCE 

 

Please call MDM Products at 800-447-7079 or 203-877-
7070 for questions about the installation of the unit in 
any way.  Care and attention to a proper installation will 
add many years of life and function to your Rhino Shelter 
unit. 
 
Please retain purchase documentation for your Rhino 
Shelter unit. All warranty claims must include purchase 
documentation for verification.  All parts on your Rhino 
Shelter unit are available for replacement as needed.  
Protect your purchase by completing warranty 
registration card and mail/fax as soon as practical after 
installing your unit. 
 
 

Summary of Contents for 12Wx24Lx8H

Page 1: ...nce or Customer Service please call 800 447 7079 or 203 877 7070 8AM 5PM EST Cartons should be inspected upon delivery from carrier and any evident damages should be noted on the bill of lading before...

Page 2: ...4 CSU 4020 Center Straight Uprights 2 5 CW 1800 Corner Wind Brace 25 6 SCR 2030 Swedged Cross Ridge Poles 5 7 ECR 2031 End Cross Poles plain ends 8 TB 3004 Turnbuckles 35 CBN 3005 3 Carriage Bolts 3...

Page 3: ...with the washers and nuts on the inside of the arches This will avoid tearing the fabric on doors and main cover when installed Do not tighten the nuts completely until the frame is completed and set...

Page 4: ...under the End Top Crest Arch at the End arch Top Ridge Under End Arches Top Ridge Over Interior Arches NOTE Do not completely tighten bolts that connect the Cross Rails to the End Arches They must be...

Page 5: ...ds of frame members NOTE Frame must be anchored before installing any doors or cover Each Rhino Shelter 12x24x12 greenhouse comes with 12 EARTH CABLE ANCHORS with U bolts and nuts These versatile anch...

Page 6: ...removed by wrapping the cable around the tie down rail END PANEL INSTALLATION Note End panels MUST be installed before installing Main Cover onto frame Step1 Remove Carriage bolts from the Top Crest R...

Page 7: ...slit another inch or two to relieve it The PE fabric is rip stop weave and can easily be cut to relieve stress at the frame members Step 3 Tie off one end of the rope coming out of the end panel to a...

Page 8: ...er tying off one end of the rope in the Main Cover pull the excess slack out of the rope and cover Hold the end of the rope and push directly down with a foot onto the excess rope Temporarily tie the...

Page 9: ...w accumulation on the main cover should be removed as soon as practical The days following a snowfall when snow melts are when the most damage can occur Unit is not designed for any amount of accumula...

Page 10: ...r questions about the installation of the unit in any way Care and attention to a proper installation will add many years of life and function to your Rhino Shelter unit Please retain purchase documen...

Reviews: