background image

                                  

As

structions Greenhouse

 

Round Style 12 x 24 x 8  

 

sembly In

 

 

V1 

Please Do NOT Return Assembly to Dealer or Store. For All questions or Shortages please call MDM Products directly 

Customer Service 800-447-7079 or 203-877-7070 

2

Note: All Side and Base Ridge Poles MUST be on Inside 
of Arch Frame Members.  Top Ridge Poles MUST be on 
Outside of Arch Frame members, except at Ends.  See 
Frame Assembly Step 5. 

RC-3020 

Right Side Crest Tube 

LC-3021 

Left Side Crest Tube –
swedged end 

10 

CSU-4020 

Center Straight Uprights 

2 5 CW-1800 

Corner 

Wind 

Brace 

25 6  SCR-2030 

Swedged 

Cross 

Ridge 

Poles 

ECR-2031 

End Cross Poles – plain 
ends 

8   TB-3004 

Turnbuckles 

35 

 

CBN-3005-3 

Carriage Bolts – 3¼” 

 

CBN-3005-2 

Carriage Bolts – 2-1/8“ 

37  

CBN-3005-N  3/8” 

Nuts 

37 

 

CBN-3005-W 

Washers – 3/8” Cupped 

2   R-3003 

3/16” 

Rope 

 

BC-36 

Bungee Cord Hold Ups 

6   DBA-3000 

Earth 

Cable 

Anchors 

 

UB-3002 

U Bolts with Nuts 

 

DR-3001 

36” Drive Rod 

 

EP-1000 

1-1/8” Plastic End Plugs 

10 

 

EP-1001 

1” Plastic End Plugs 

P
u
a

 

End Arch 

 

 

Top Ridge Rail 

Interior Arch 

Side Cross Rail

Left Side Crest 
Tube 

Base Side Rail

Center Straight Upright

Wind Brace

End Upright w/Foot 

Right Side 

Crest Tube 

Plain End Cross Rail 

Summary of Contents for 12Wx24Lx8H

Page 1: ...nce or Customer Service please call 800 447 7079 or 203 877 7070 8AM 5PM EST Cartons should be inspected upon delivery from carrier and any evident damages should be noted on the bill of lading before...

Page 2: ...4 CSU 4020 Center Straight Uprights 2 5 CW 1800 Corner Wind Brace 25 6 SCR 2030 Swedged Cross Ridge Poles 5 7 ECR 2031 End Cross Poles plain ends 8 TB 3004 Turnbuckles 35 CBN 3005 3 Carriage Bolts 3...

Page 3: ...with the washers and nuts on the inside of the arches This will avoid tearing the fabric on doors and main cover when installed Do not tighten the nuts completely until the frame is completed and set...

Page 4: ...under the End Top Crest Arch at the End arch Top Ridge Under End Arches Top Ridge Over Interior Arches NOTE Do not completely tighten bolts that connect the Cross Rails to the End Arches They must be...

Page 5: ...ds of frame members NOTE Frame must be anchored before installing any doors or cover Each Rhino Shelter 12x24x12 greenhouse comes with 12 EARTH CABLE ANCHORS with U bolts and nuts These versatile anch...

Page 6: ...removed by wrapping the cable around the tie down rail END PANEL INSTALLATION Note End panels MUST be installed before installing Main Cover onto frame Step1 Remove Carriage bolts from the Top Crest R...

Page 7: ...slit another inch or two to relieve it The PE fabric is rip stop weave and can easily be cut to relieve stress at the frame members Step 3 Tie off one end of the rope coming out of the end panel to a...

Page 8: ...er tying off one end of the rope in the Main Cover pull the excess slack out of the rope and cover Hold the end of the rope and push directly down with a foot onto the excess rope Temporarily tie the...

Page 9: ...w accumulation on the main cover should be removed as soon as practical The days following a snowfall when snow melts are when the most damage can occur Unit is not designed for any amount of accumula...

Page 10: ...r questions about the installation of the unit in any way Care and attention to a proper installation will add many years of life and function to your Rhino Shelter unit Please retain purchase documen...

Reviews: