background image

8

Engage Side Supports

 

Lift the front of the rail slightly and slide the first side 

support over the slot in the tray. Lower the channel nut 

into the slot and slide the side support towards the end 

moulding. 

Repeat this process for all side supports, sliding the rail 

further onto the tray.

Side Support

9

Align End Supports

 

Slide the end supports so they align with the appropriate plank ready for fitment. Refer to the images below for 

correct plank alignment to suit your tray.

5 Plank Trays

4 Plank Trays

Page 5 of 7 

Rhino Pioneer Front / Side Rail Kit

Reviews: