background image

6

Fit Side Support Mouldings and Rail End Moulding

 

Slide the side supports and end mouldings into the side rail extrusions as shown below and fasten with screws.

Screw

Side Support

End Moulding

7

Insert First Channel Nuts into Slots

 

Lower the rail assembly onto the tray so that the channel 

nuts fitted to the end mouldings locate within the slots at 

the front of the tray. 

Next slide the rail assembly onto the tray slightly so the 

nuts engage in the channel.

End Moulding

M8 Channel Nut

Slot

5

Fit Side Rail Extrusions to End Rail Assembly

 

Slide the side rail extrusions onto the ends of the corner 

mouldings as shown and fasten with screws.

Side Rail Extrusion

End Rail Assembly

Screw

Page 4 of 7 

Rhino Pioneer Front / Side Rail Kit

Reviews: