![Rheem RRNL-B Installation Instructions Manual Download Page 34](http://html1.mh-extra.com/html/rheem/rrnl-b/rrnl-b_installation-instructions-manual_1451504034.webp)
pull wires through the hole on the bottom of the control box on the left side and into
the control box. Reconnect fan motor wires per the wiring diagram attached to the
back of the control box cover.
4. Replace wire strain relief in bulkhead after the slack is pulled out of the wires on the
fan side. This will assure wires will not be damaged by the fan during unit operation.
5. Turn the condenser fan grille assembly over and into the recess in the unit top.
Secure the grille to the unit with the four screws removed earlier.
6. Replace the circulating air blower, making sure that all wires are properly reconnect-
ed per the unit wiring diagram.
7. Replace the filter and blower/evaporator coil access panels.
8. Replace the control box cover and controls access panel.
9. Restore electrical power to the unit and check for proper operation, especially the
condenser fan motor.
E. REPLACEMENT PARTS
Contact your local distributor for a complete parts list.
F. CHARGING
Refer to the appropriate charge chart included in this manual.
G. RRNL-/RRPL- BLOWER MOTOR SPEED ADJUSTMENTS
Note: These instructions to be used in conjunction with airflow data tables.
After determining necessary CFM and speed tap, follow the steps below to change
speeds.
Units with PSC Blower Motors:
1. Remove the furnace/control access panel.
2. Remove the control box cover. See Figure 25 for location of the furnace control
board.
3. Reference Figure 26 for the proper location of the wires on the speed tap block and
on the furnace control board to obtain the speed tap you have chosen.
Note: 460V units have dedicated heating and cooling speeds and should not be
adjusted.
4. After adjusting the wires accordingly, attach the control box cover, furnace control
access panel and the blower access panel to the unit.
Units with X-13 Motors
1. Remove blower access panel.
2. Locate wire terminals on the motor. Numbered terminals are 24V blower taps (See
airflow tables for corresponding speed). The C terminal is 24V common. L, N, and G
terminals are high voltage and must remain unchanged.
3. Cooling speeds can be adjusted as noted in Figure 26 by moving appropriate wire
between taps at the blower (Do not connect wires to unspecified speed taps).
Note: Heat speed is dedicated and should not be changed. The first stage cooling
speed on 5-ton models is dedicated and should not be changed.
4. Replace blower access panel.
!
WARNING
DISCONNECT MAIN ELECTRICAL POWER TO THE UNIT BEFORE ATTEMPT-
ING TO CHANGE BLOWER SPEEDS. FAILURE TO DO SO MAY RESULT IN
ELECTRICAL SHOCK OR SEVERE PERSONAL INJURY OR DEATH.
34
Summary of Contents for RRNL-B
Page 39: ...39 FIGURE 31 COOLING ON DELAY PROFILES INTERFACE BOARD SWITCH 7 8 7 8 7 8 7 8...
Page 40: ...FIGURE 32 BLOWER OFF DELAY PROFILES INTERFACE BOARD SWITCH 7 8 7 8 7 8 7 8 40...
Page 77: ...FIGURE 35 WIRING DIAGRAM XV WIRING DIAGRAMS 77...
Page 78: ...FIGURE 36 WIRING DIAGRAM 78...
Page 79: ...FIGURE 37 WIRING DIAGRAM 5 TON 4 TON LOW HEAT HIGH COOL 3 TON LOW HEAT MED COOL 79...
Page 80: ...FIGURE 38 WIRING DIAGRAM 80...
Page 81: ...FIGURE 39 WIRING DIAGRAM 81...
Page 82: ...FIGURE 40 WIRING DIAGRAM 82...
Page 83: ...FIGURE 41 WIRING DIAGRAM 83...
Page 84: ...FIGURE 42 WIRING DIAGRAM 84...
Page 85: ...FIGURE 43 WIRING DIAGRAM 85...
Page 86: ...86 FIGURE 44 WIRING DIAGRAM...
Page 87: ...87 FIGURE 45 WIRING DIAGRAM...
Page 90: ...FIGURE 48 SYSTEM CHARGE CHARTS RNL RPL 3 TON COOLING SYSTEM CHARGE CHART REFRIGERANT 410A 90...
Page 92: ...FIGURE 50 SYSTEM CHARGE CHARTS RNL RPL 4 TON COOLING SYSTEM CHARGE CHART REFRIGERANT 410A 92...
Page 108: ...108 CM 0314...