![Rheem Raypak Hi Delta 302C Installation And Operation Manual Download Page 25](http://html1.mh-extra.com/html/rheem/raypak-hi-delta-302c/raypak-hi-delta-302c_installation-and-operation-manual_4133547025.webp)
25
Figure 29. Be sure not to damage the seal when removing
or replacing the pump body
Figure 30. Reposition the pump body so that the electrical
box points downward
3. Insert and tighten all eight (8) bolts, securing the
pump body in place.
4. You will now be able to install the pump cover. See
Figure 31
and
Figure 32
.
Figure 31. Place the cover on the pump
Figure 32. Pump cover - angle view
Summary of Contents for Raypak Hi Delta 302C
Page 14: ...14 Wiring Diagrams Cold Water Start...
Page 29: ...29 Wiring Diagrams Cold Water Run SEE PAGE 17...
Page 31: ...31 7 ILLUSTRATED PARTS LISTS Cold Water Start Manufactured from 2006 through current...
Page 32: ...32 1 M 8 M Cold Water Start...
Page 33: ...33 Cold Water Start Multiple Boiler Interlock...
Page 34: ...34 NOTE Sizing is specific to the application...
Page 37: ...37 NOTE Sizing is specific to the application...
Page 38: ...38 NOTES...
Page 39: ...39 NOTES...