3
WARNINGS 4
BEFORE INSTALLATION
Product Receipt
Model Identification
Ratings and Certifications
Installations at Elevation
Component Locations
General Information
GENERAL SAFETY
Time/Temperature Relationships in
Scalds
INSTALLATION
Installation Codes
Equipment Base
Stacking
Clearances
Combustion and Ventilation Air
Conventional Combustion
Air Supply
Water Piping
Hydronic Heating
Gas Supply
Electrical Power Connections
Field Wiring Connection
Venting
Changing the Flue Outlet
Venting Installation Tips
Venting Configurations
Outdoor Installation
Controls
Heater Sequence of Operation
Wiring Diagrams
START-UP
Pre Start-up
Start-Up
OPERATION
Lighting Instructions
To Turn Off Gas To Appliance
TROUBLESHOOTING
MAINTENANCE
47
Suggested Minimum
Maintenance Schedule
Preventive Maintenance Schedule
APPENDIX
Inside Air Contamination
ILLUSTRATED PARTS LIST
QR CODE
64
WARRANTY 65
START-UP CHECKLIST
66
TABLE OF CONTENTS
THIS INSTALLATION MANUAL MAY NOT BE THE LATEST REVISION PRINTED AT THE TIME OF PRODUCT SHIPMENT. VISIT THE
RAYPAK WEBSITE TO VERIFY THE MANUAL DELIVERED WITH YOUR RAYPAK UNIT IS THE MOST UP-TO-DATE VERSION.
Summary of Contents for Raypak Delta Limited 399B
Page 39: ...39 Wiring Diagram Models 399B 1259B...
Page 40: ...40 Wiring Diagram Models 1529B 2339B...
Page 51: ...51 DIAGNOSTIC DETAIL 12 J 7 J 6 J 5 J 3 0 2 0 16 S 1 F 2 F 3 F 4 F BLOWER DETAIL...
Page 53: ...53 13 J 8 J 10 J 11 J 4 J 2 J 3 J 6 C 14 J 9 J 1 J CONTROL BOX DETAILS...
Page 57: ...57 ILLUSTRATED PARTS LIST MODELS 989B 2339B 10 J 3 O 5 O...
Page 58: ...58 12 H 6 H 7 H 8 H 2 H 9 H 3 H 5 H 1 H 4 H 1 P HEAT EXCHANGER DETAILS BURNER ASSEMBLY DETAILS...
Page 59: ...59 CONTROL BOX DETAILS 9 J 8 J 23 S 13 J 10 J 3 O 10 J 3 O 5 O FRONT SWITCH DETAILS...
Page 66: ...66...
Page 67: ...67 Raypak Inc 2151 Eastman Avenue Oxnard CA 93030 805 278 5300 Litho in U S A NOTES...