LP CONVERSION
The gas valve is not field convertible for
use with LP gas. LP conversion kit no.
RXGJ-FP09 is required. The kit
includes a LP gas valve, burner orifices
and the Installation Instructions. Follow
the kit instructions for installing and
adjusting the orifices and valve.
NOTE:
Order the correct LP conversion
kit from the furnace manufacturer.
Furnace conversion to LP gas must
be performed by a qualified
technician.
To change orifice spuds for either
conversion to LP or for elevation:
1. Shut off the manual main gas
valve and remove the gas supply
piping from the gas valve.
2. Remove the four (4) screws
securing the manifold assembly
and remove the assembly.
3. Replace the orifice spuds.
4. Reassemble in reverse order.
Consult the tables at right if there is any
question concerning orifice sizing.
5. Turn the gas supply back on and
check for proper operation and
manifold pressure.
6. Attach the notice label alerting the
next service technician that the
furnace has been converted to LP
gas.
17
RATING PLATE
ELEVATION
INPUT
BTU/HR
0 TO 7,999 FT.
8,000 FT. AND ABOVE
NATURAL GAS
HEATING VALUE @ 1,000 BTU/FT
3
, SPECIFIC GRAVITY 0.62
MANIFOLD PRESSURE @ 3.5
(
W.C.
50,000
42
43
75,000
42
43
100,000
42
43
125,000
42
43
150,000
42
43
L.P. GAS
HEATING VALUE @ 2,475 BTU/FT
3
, SPECIFIC GRAVITY 1.52/
MANIFOLD PRESSURE @ 10
(
W.C.
50,000
54
55
75,000
54
55
100,000
54
55
125,000
54
55
150,000
54
55
ORIFICE SIZING CHART
RATING PLATE
ELEVATION
INPUT
BTU/HR
0 TO 1,999 FT.
2,000 FT. TO 4,500 FT.
NATURAL GAS
HEATING VALUE @ 1,000 BTU/FT
3
, SPECIFIC GRAVITY 0.62
MANIFOLD PRESSURE @ 3.5
(
W.C.
50,000
42
42
75,000
42
42
100,000
42
42
125,000
42
42
150,000
42
42
L.P. GAS
HEATING VALUE @ 2,475 BTU/FT
3
, SPECIFIC GRAVITY 1.52/
MANIFOLD PRESSURE @ 10
(
W.C.
50,000
54
54
75,000
54
54
100,000
54
54
125,000
54
54
150,000
54
54
ORIFICE SIZING CHART (CANADA)
Summary of Contents for 1x2000
Page 20: ...20 FIGURE 16 UTEC NO 1095 100 CONTROL BOARD TWINNING CONNECTION SINGLE STAGE OPERATION I685 ...
Page 21: ...21 FIGURE 17 UTEC NO 1095 100 CONTROL BOARD TWINNING CONNECTION TWO STAGE OPERATION I684 ...
Page 29: ...29 FIGURE 25 FILTER RETAINING RODS SIDE RETURN FIGURE 26 DOWNFLOW FILTER INSTALLATION ...
Page 31: ... FIGURE 27 INTEGRATED FURNACE CONTROL IFC TROUBLESHOOTING GUIDE FOR UTEC 1095 101 31 ...
Page 32: ...32 ...
Page 33: ... FIGURE 28 UTEC 1095 101 INTEGRATED FURNACE CONTROL 33 ...
Page 34: ...34 ...
Page 35: ...35 ...
Page 36: ...36 CM 599 Rheem Manufacturing Company Air Conditioning Division Fort Smith Arkansas ...