MAN2100160 rel. 00 dated 05.11.2013 page no. 52 of 53 pages
www.rheavendors.com tel: 0039 02 966 551 fax: 0039 02 96 55 086 e mail: [email protected]
exclusive property of rheavendors group
13.15. regulate the speed
of mixers
13.16. choose the
quantity of break
numbers
13.17. time tests
13.18. determine the
suction fan time
13.19. remove water
13.20. install a payment
system
13.21. return some
material under guarantee
the rotation speed of the motors of product mixers can be adjusted
between 15,000 r.p.m. and 5,000 r.p.m.; the drink quality of
instant products depends a lot upon the action of the fans of
mixers: instant chocolate generally requires a long mixing time at
the maximum speed for dissolution in water whereas instant tea
shall not be mixed to get a drink quality without any bubble on the
surface;
if instant products can be hardly dissolved in water, it may be of
use to stop the product dispensing cycle from the product canister
for a short time; the water flowing into the mixing bowl will have
the time necessary to remove any product build-up;
to check the rotation time of a product motor and a mixer fan or
the activation time of a solenoid valve during the programming
phase, when the display shows “PRODUCT N” or “WATER N time”
or “MIXER N”, press the “PROG” key: the device will be activated
for the programmed time;
to remove the residual powder of instant products from inside the
machine, it is recommended to use the value in minutes you have
already programmed (three); if you should use particularly volatile
products, increase the time to five (and more) minutes;
to discharge the water from the machine circuits:
- detach the water supply, disassemble the rear panel; connect
a tube 6X9 with the drain of the pressured boiler (see
05.35.) to convey water to a bucket that shall be placed on
the floor, having a capacity of at least three litres;
- power on the machine by means of the service key, access
the programming mode
“miscellaneous”
“deinstallation”;
and follow the 09.01.f. point instructions:
- the machine pump will start working to discharge water from
the boiler and the tubes into the bucket; the time necessary
to discharge is over six minutes to enable water to flow
completely; the display shows:
- while removing the fastening screw from the plug, extract the
drain tube of the air break and empty it by conveying water into
the bucket;
- re-insert the plug into the tube and remount it on the machine by
means of its fastening screw;
- remove the tube from the drain solenoid valve of the boiler;
- re-mount the rear panel of the machine;
there is a kit including all the parts necessary to install a payment
system in
Cino XS grande PRO
; after having installed the
components of this kit, refer to the above to programme the
system functionality;
Rheavendors Services S.p.A. is at disposal for any kind of support
and information on the installation of payment systems; (see
02.02.);
if you should return any material under guarantee that is either
defective or not in compliance with your requirements, fill in the
form “MOD. PO 19.01/2B Materials under guarantee –
Authorisation to return” and send it to the fax number above to
apply for authorisation; only after having received the authorisation
form signed and numbered, you are permitted to send the goods at
your expenses to the address specified by the form;
see 09.01.a.
see 09.01.f.
Deinstallation
10=START
Cino XS grande PRO and PRO VHO
by